Table 2.6 - Summary of Field Effort 1 Activities (RL17) to be Performed at SWMUs

Site

Priority

Delist

Anticipated Analyses

Geophysical

VOCs

Metals

Expl.

SVOCs

Survey

B-5

L

I

3

3

3

-

Y

B-6

L

I

3

3

-

3

Y

B-7

L

-

3

3

3

-

Ö

B-14

L

Y

-

-

-

-

-

B-22

L

-

5

5

5

-

Ö

B-25

L

I

3

3

-

3

Y

B-26

L

I

3

3

-

3

Y

Coal Bins

L

Y

-

-

-

-

-

B-1*

M

-

-

0

-

0

Ö

B-8*

M

-

0

0

0

-

Ö 1

B-9

M

-

3

3

3

3

Y

B-12*

M

-

0

0

0

9

Ö

B-13*

M

-

0

0

-

9

Y

B-19*

M

-

3

0

-

9

Ö

B-27

M

-

3

3

-

3

Y

B-29

M

-

3

3

3

3

Y

B-30

M

-

3

3

-

3

Y

B-31

M

-

-

3

3

-

Y

B-32

M

-

-

3

3

-

Y

B-33

M

-

-

3

3

-

Y

B-34

M

-

3

3

-

3

Y

B-10

H

-

-

-

-

-

Y

B-15/16

H

-

-

-

-

-

Ö 3

B-23/23A

H

-

-

-

-

-

Ö

Bldg 43

H

-

-

-

-

-

Y

I-1

H

-

-

-

-

-

Y

O-1

H

-

-

-

-

-

Ö

L - Low priority

M - Medium priority

H - High priority

Y - Required activity

I - If appropriate based on field conditions.

Expl. - Explosive analysis

* - Sampling effort will be conducted during the second field effort

Ö - Geophysical or soil gas survey performed in previous project