Work Plan
Table 2.6 - Summary of Field Effort 1 Activities (RL17) to be Performed at SWMUs
Site |
Priority |
Delist |
Anticipated Analyses |
Geophysical |
||||
VOCs |
Metals |
Expl. |
SVOCs |
Survey |
||||
L |
I |
3 |
3 |
3 |
- |
Y |
||
L |
I |
3 |
3 |
- |
3 |
Y |
||
L |
- |
3 |
3 |
3 |
- |
Ö |
||
L |
Y |
- |
- |
- |
- |
- |
||
L |
- |
5 |
5 |
5 |
- |
Ö |
||
L |
I |
3 |
3 |
- |
3 |
Y |
||
L |
I |
3 |
3 |
- |
3 |
Y |
||
L |
Y |
- |
- |
- |
- |
- |
||
M |
- |
- |
0 |
- |
0 |
Ö |
||
B-8* |
M |
- |
0 |
0 |
0 |
- |
Ö 1 |
|
M |
- |
3 |
3 |
3 |
3 |
Y |
||
B-12* |
M |
- |
0 |
0 |
0 |
9 |
Ö |
|
B-13* |
M |
- |
0 |
0 |
- |
9 |
Y |
|
B-19* |
M |
- |
3 |
0 |
- |
9 |
Ö |
|
M |
- |
3 |
3 |
- |
3 |
Y |
||
M |
- |
3 |
3 |
3 |
3 |
Y |
||
M |
- |
3 |
3 |
- |
3 |
Y |
||
M |
- |
- |
3 |
3 |
- |
Y |
||
M |
- |
- |
3 |
3 |
- |
Y |
||
M |
- |
- |
3 |
3 |
- |
Y |
||
M |
- |
3 |
3 |
- |
3 |
Y |
||
H |
- |
- |
- |
- |
- |
Y |
||
H |
- |
- |
- |
- |
- |
Ö 3 |
||
H |
- |
- |
- |
- |
- |
Ö |
||
H |
- |
- |
- |
- |
- |
Y |
||
H |
- |
- |
- |
- |
- |
Y |
||
H |
- |
- |
- |
- |
- |
Ö |
||
L - Low priority M - Medium priority H - High priority Y - Required activity I - If appropriate based on field conditions. Expl. - Explosive analysis * - Sampling effort will be conducted during the second field effort Ö - Geophysical or soil gas survey performed in previous project |