[Home]

[Volume 1-2]

SWMU B-25 Links

SWMU B-25 View Facing North, January 1999

Site Status: Closed (July 2005)

Background

Description in Current Conditions Report (July 1999)

Chronology

Aerial Photograph

Figure B25-1 Plan View Map

Plans (Volume 1-2)

RL17 RFI Work Plan (February 1996)

RL17 Work Plan Amendment for Data Quality Rework (May 2000)

TO0019 Work Plan (December 2003)

Investigation Reports (Volume 3-1)

RCRA Facility Investigation Report

RCRA Facility Investigation Closure Report

Tables

Table B25-1  Summary of Chemical Constituents Detected in Surface Soil (March 2000) 

Table B25-2  Summary of Chemical Constituents Detected in Subsurface Soil (March 2000) 

Figures

Geophysical Anomaly Map

Figure B25-1  Site Location Map

Figure B25-2  Soils and Topographic Map

Figure B25-3  Geologic Setting

Figure B25-4  Sample Location Map

Figure B25-5  In-Phase Electromagnetic Data Map

Figure B25-6 Quadrature Phase Electromagnetic Data Map

Boring Logs

B25-SB1 (September 1996/March 2000)

B25-SB2 (September 1996/March 2000)

B25-SB3 (September 1996/March 2000)