SWMU B-10 Links

SWMU B-10, view facing north - May 2001

Site Status: Closed (January 2004)

Background

Description in Current Conditions Report (July 1999)

Chronology

Aerial Photograph

Figure B10-1 Plan View Map

Plans (Volume 1-2)

RL17 Work Plan (February 1996)

RL53 Work Plan Amendment (May 2000)

Investigation Reports (Volume 3-1)

RCRA Facility Investigation/Closure Report (May 2003)

Tables

Table B10-1   Summary of Chemical Constituents Detected in Soil Gas (May 2003)

Table B10-2   Summary of Chemical Constituents Detected in Soil (May 2003) 

Table B10-3   Summary of Chemical Constituents Detected in Waste Characterization Samples (May 2003)

Table B10-4   Summary of Chemical Constituents Detected in Confirmation Soil Samples (May 2003)

Figures

Figure B10-1   Sample Location Map (May 2003)

Figure B10-2   Soils and Topographic Map (May 2003)

Figure B10-3   Geologic Setting (May 2003)

Figure B10-4   PCE Soil Gas Contour Map (May 2003)

Figure B10-5   Geophysical Grid Survey Map (May 2003)

Figure B10-6   Quadrature Phase Electromagnetic Data Map (May 2003)

Figure B10-7   In-Phase Electromagnetic Data Map (May 2003)

Figure B10-8   Sample Location Map (May 2003)

Figure B10-9   1996 PCE Soil Gas Map

Figure B10-10     Former PIMS Location