[Home]

[Volume 1-2]

 

SWMU B-1 Links

Site Status: Closed (November 2002)

Background

Description in Current Conditions Report (July 1999)

Chronology

Aerial Photograph

Figure B1-1 Plan View Map

Plans (Volume 1-2)

RL17 RFI Work Plan (February 1996)

RL17 Work Plan Amendment for Data Quality Rework (May 2000)

Investigation/Closure Reports (Volume 3-1)

List of Previous Investigation Reports

Section Two of Technical Memorandum on Surface Geophysical Surveys, Well 16 Source Characterization (June 1995)

Section Three of Technical Memorandum on Soil Boring Investigation (June 1995)

Addendum to Technical Memorandum on Soil Boring Investigation (August 1995)

RCRA Facility Investigation/Closure Report (July 2002)

Tables

Table B1-1   Chemical Constituents Detected in Soil (February 1995)

Table B1-2   Chemical Constituents Detected in Groundwater (February 1995)  

Table B1-3   Summary of Chemical Constituents Detected in Soil (March 2000)

Figures

Analytical Results Map (February 1995)

Figure B1-1   Sample Location Map

Figure B1-2   Soils and Topographic Map

Figure B1-3   Geologic Setting

Figure B1-4   Sample Location Map

Boring Logs

Soil Boring Log 1 (February 1995)

Soil Boring Log 2 (February 1995)

Soil Boring Log 3 (February 1995)