1954

Unknown

Powder and ammunition burn area used for burning powder and incendiary materials.

CSSA

NA

1992

October

Reviewed available records at CSSA during preliminary evaluation for groundwater contamination.

Parsons ES

Order 67

1995

February

Performed EM geophysical survey on February 10. Found no geophysical anomalies.

Parsons ES

Order 67

1995

February

Performed GPR survey at the site.

Parsons ES

Order 67

1995

February

Drilled three soil borings (SB1-SB3) on Feb. 21 and 22 and collected soil/rock samples. Phthalates were detected in each of the borings; however, SVOC results were rejected due to deficiencies in quality control criteria. Results are summarized in Table B1-1. Metals concentrations were below the background levels.

Parsons ES

Chemron

JEDI

Order 67

1995

February

Collected sample of shallow perched groundwater from SB3 on February 23. A low concentration of chromium (below the MCL) was detected in the duplicate sample only. Results are summarized in Table B1-2.

Parsons ES

Chemron

Order 67

1995

June

Drilled one soil boring (SB1R) on June 13 and collected soil/rock samples. Soil boring was redrilled and resampled due to laboratory QA/QC problems from sampling effort in February. No analytes found above comparison criteria.

Parsons ES

Chemron

JEDI

Order 67

1996

February

Work Plan for additional investigation at B-1 submitted.

Parsons ES

RL17

1996

August - September

Drilled three soil borings (SB4-SB6) on August 20 through September 4 and collected soil/rock samples for SVOC analysis. These analytical results are currently in question due to ITS Laboratory practices.

Parsons ES

CoreTerra

ITS

RL17

1999

April

EPA memorandum indicated analytical results obtained from ITS are not usable.

EPA

NA

1999

November

Submitted work plan for resampling to replace analytical chemistry data generated by ITS Laboratory.

Parsons ES

NA

2000

March -April

Drilled three soil borings for rework (SB4-SB6) and collected 8 rock/soil samples for SVOC analysis.

Parsons ES

APPL, Inc.

Rework

2002

July

Final RCRA Facility Investigation/Closure Report submitted to TCEQ.

Parsons

RL17

2002

November

Closure approved by TCEQ.

TCEQ