[Home] [Master Table of Contents]
Volume 4 - Treatment Technologies and Treatability Studies
Table of Contents
Soil Vapor Extraction
Addendum to SVE Test Work Plan for SWMU B-3
(December 1996)
Soil Vapor Extraction Test Work Plan Second Addendum
(December 1999)
Soil
Vapor Extraction Test Report for SWMU B-3 (November 2001)
Soil
Vapor Extraction Operations & Maintenance Report (April 2003)
Operation and Maintenance Plan for AOC-65 Soil Vapor Extraction
System (October 2003)
Operation and
Maintenance Plan for AOC-65 & SWMU B-3 Soil Vapor Extraction Systems
(June 2005)
Final AOC-65 Soil Vapor Extraction Operations & Maintenance Assessment Report (April 2008)
Operation and Maintenance Plan for AOC-65 Soil Vapor Extraction System (June 2008 Update)
Update to AOC-65 Soil Vapor Extraction O&M Assessment Report (July 2010)
Update to AOC-65 Soil Vapor Extraction O&M Assessment Report (August 2010)
Update to AOC-65 Soil Vapor Extraction O&M Assessment Report (January 2011)
AOC-65 Soil Vapor Extraction Installation Work Plan Addendum (March 2011)
Update to AOC-65 Soil Vapor Extraction O&M Assessment Report (December 2012)
Electrokinetics
O-1 Treatability Study (April 1999)
Phytoremediation
Soil Washing
Final Soil Washing Treatability Study Report for SWMU B-20 (May 2000)
Stabilization and Off-Site Disposal
Final
B-20 Soil Stabilization/Solidification Treatability Study Report
(May 2000)
RFI
and Interim Measures Waste Management Plan (August 2002)
Soil Pile Disposition Assessment
Area of Concern 65 Treatability Studies
AOC-65 Treatability Test Plan (April 2002)
Final PIMS™ Treatability Study (February 2004)
Final Addendum Work Plan for AOC-65 Interim Removal (January 2012)
Final ISCO Tracer Test Work Plan (May 2012)
Residential Vapor Intrusion Survey for AOC-65 (January 2013)
Final Work Plan for ISCO Treatability Study (April 2013)
AOC-65 In-Situ Chemical Oxidation Operations and Monitoring Plan (November 2013)
SWMU B-3 Bioreactor
Class V Underground Injection Well SWMU B-3 Bioreactor (October 2005)
Westbay Technical Memorandum (November 2005)
Class V Underground Injection Well SWMU B-3 Bioreactor (May 2006)
Construction Quality Assurance Plan, Revision 1 (August 2006)
Final SWMU B-3 Bioreactor Operation & Maintenance Manual (July 2008 Update)
Final SWMU B-3 Bioreactor Operation & Maintenance Manual (July 2010)
Final Quarter 13 Bioreactor Performance Status Report (September 2010)
CSSA B-3 Extraction Well Construction Summary (September 2010)
Final DO 50 B-3 New Wells Technical Memorandum (October 2010)
SWMU B-3 Bioreactor Operation & Maintenance Manual (November 2010)
Operation & Maintenance Manual Update
Appendix A - TCEQ Authorization Letter
Appendix B - Product Information, Recovery Well Pumps and SymCom PumpSaver
Appendix C - Product Information, Price Pump XT150 Centrifugal Pump and Baldor Pump Motor
Appendix D - Product Information, Krystil Klear Filtration Model 88 Bag Filter
Appendix E - Product Information, FullJet Standard Type G Spray Nozzles
Appendix F - Automation System Design
Appendix G - Product Information, GPI TM150 Endress+Hauser Prowhirl 72F, FT420 Flow Computer
Appendix I - SCADA Control Components
Final Quarter 14 Bioreactor Performance Status Report (February 2011)
Final SWMU B-3 Bioreactor Operation & Maintenance Manual (November 2011 Update)
Annual Bioreactor Performance Status Report (June 2012)
B3-EXW05-LGR Installation Report (December 2012)
Final SWMU B-3 Bioreactor Operation & Maintenance Manual (December 2012 Update)
Lactate Injection Evaluation Technical Memo (January 2013)
Annual Status Report (Months 73 - 84, May 1, 2013 - April 30, 2014) (July 2014)
In-Situ Chemical Oxidation
Final ISCO Work Plan (July 2012)
Final AOC-65 ISCO Phases I and II Assessment Report (February 2015)
Final AOC-65 ISCO Phase III Assessment Report (March 2016)
Final AOC-65 ISCO Operations and Maintenance Manual (January 2018)
Update to AOC-65 ISCO Phase V Assessment Report (February 2018)