Volume 4 - Table of Contents

[Home] [Master Table of Contents]

Volume 4 - Treatment Technologies and Treatability Studies

Table of Contents

Soil Vapor Extraction

Addendum to SVE Test Work Plan for SWMU B-3 (December 1996)  

Soil Vapor Extraction Test Work Plan Second Addendum (December 1999)  

Soil Vapor Extraction Test Report for SWMU B-3 (November 2001)  

Soil Vapor Extraction Operations & Maintenance Report (April 2003)  

Operation and Maintenance Plan for AOC-65 Soil Vapor Extraction System (October 2003)  

Operation and Maintenance Plan for AOC-65 & SWMU B-3 Soil Vapor Extraction Systems (June 2005)

Final AOC-65 Soil Vapor Extraction Operations & Maintenance Assessment Report (April 2008)

Operation and Maintenance Plan for AOC-65 Soil Vapor Extraction System (June 2008 Update)

Update to AOC-65 Soil Vapor Extraction O&M Assessment Report (July 2010)

Update to AOC-65 Soil Vapor Extraction O&M Assessment Report (August 2010)

Update to AOC-65 Soil Vapor Extraction O&M Assessment Report (January 2011)

    Section 1

    Section 2

Work Plan Addendum for the Installation of LGR Monitoring Wells and AOC-65 SVE Enhancement Wells (March 2011)

AOC-65 Soil Vapor Extraction Installation Work Plan Addendum (March 2011)

Update to AOC-65 Soil Vapor Extraction O&M Assessment Report (December 2012)

Electrokinetics 

O-1 Treatability Study (April 1999)

Phytoremediation

Work Plan for B-20 Phytoremediation Treatability Study (September 1997)  

Final Phytoremediation Treatability Study Report (May 2001)

Soil Washing

Final Soil Washing Treatability Study Report for SWMU B-20 (May 2000)

Stabilization and Off-Site Disposal

Final B-20 Soil Stabilization/Solidification Treatability Study Report (May 2000)  

PIMS Field Demonstration Workplan (June 2001)  

RFI and Interim Measures Waste Management Plan (August 2002)

Soil Pile Disposition Assessment

 Soil Pile Disposition Assessment (August 2003)

Area of Concern 65 Treatability Studies

AOC-65 Treatability Test Plan (April 2002)

Final PIMS™ Treatability Study (February 2004)

Final Addendum Work Plan for AOC-65 Interim Removal (January 2012)

Final ISCO Tracer Test Work Plan (May 2012)

Residential Vapor Intrusion Survey for AOC-65 (January 2013)

Final Work Plan for ISCO Treatability Study (April 2013)

AOC-65 In-Situ Chemical Oxidation Operations and Monitoring Plan (November 2013)

SWMU B-3 Bioreactor

Class V Underground Injection Well SWMU B-3 Bioreactor (October 2005)

Westbay Technical Memorandum (November 2005)

Class V Underground Injection Well SWMU B-3 Bioreactor (May 2006)

Construction Quality Assurance Plan, Revision 1 (August 2006)

SWMU B-3 Bioreactor Construction Report (February 2007)

Final SWMU B-3 Bioreactor Operation & Maintenance Manual (July 2008 Update)

Final SWMU B-3 Bioreactor Operation & Maintenance Manual (July 2010)

Final Quarter 13 Bioreactor Performance Status Report (September 2010)

CSSA B-3 Extraction Well Construction Summary (September 2010)

Final DO 50 B-3 New Wells Technical Memorandum (October 2010)

SWMU B-3 Bioreactor Operation & Maintenance Manual (November 2010)

Operation & Maintenance Manual Update

Appendix A - TCEQ Authorization Letter

Appendix B - Product Information, Recovery Well Pumps and SymCom PumpSaver

Appendix C - Product Information, Price Pump XT150 Centrifugal Pump and Baldor Pump Motor

Appendix D - Product Information, Krystil Klear Filtration Model 88 Bag Filter

Appendix E - Product Information, FullJet Standard Type G Spray Nozzles

Appendix F - Automation System Design

Appendix G - Product Information, GPI TM150 Endress+Hauser Prowhirl 72F, FT420 Flow Computer

Appendix H - Product Information, Magnetrol Liquid Level Switch Model T21 and Displacer Type, Endress+Hauser FMU40 Ultrasonic Meter, In-Situ LevelTroll 500, and Endress+Hauser WaterPilot FMX167

Appendix I - SCADA Control Components

Appendix J - Product Information, Westbay Manual

Appendix K - Field Monitoring Forms

Final Quarter 14 Bioreactor Performance Status Report (February 2011)

CSSA B-3 Bioreactor Operations Annual Performance Status Report (Quarter 13 – Quarter 16, May 2010 – April 2011) (August 2011)

Final SWMU B-3 Bioreactor Operation & Maintenance Manual (November 2011 Update)

Annual Bioreactor Performance Status Report (June 2012)

B3-EXW05-LGR Installation Report (December 2012)

Final SWMU B-3 Bioreactor Operation & Maintenance Manual (December 2012 Update)

Lactate Injection Evaluation Technical Memo (January 2013)

Annual Status Report (Months 73 - 84, May 1, 2013 - April 30, 2014) (July 2014)

In-Situ Chemical Oxidation

Final ISCO Work Plan (July 2012)

Final AOC-65 ISCO Phases I and II Assessment Report (February 2015)

Final AOC-65 ISCO Phase III Assessment Report (March 2016)

Final AOC-65 ISCO Operations and Maintenance Manual (January 2018)

Update to AOC-65 ISCO Phase V Assessment Report (February 2018)