Table of Contents
Section 2 - Operations and mantenance Testing Protocols
2.2 Initial soil gas and Flow adjustments
2.3 Bi-Weekly System Checks and Monthly Monitoring
Section 3 - Results and Data Evaluation
3.2 Bi-weekly System Checks and Monthly Monitoring Results
3.3 Soil and Gas Air Emission Results
3.4 Groundwater Evaluation results
Section 4 - Technology Evaluation
Section 5 - Conclusions and Recommendations
Appendices
B Contaminant Mass Removal Calculation Tables
C Technology Evaluation Memorandum, Veg/oil bark mulch enhancement
List of Figures
Figure 1.1 As-Built Expanded SVE System Layout SWMU B-3 SWMU B-3 SVE O&M Assessment
Figure 3.1 Water Level in VEW-01 and Daily Precipitation SWMU B-3 SVE O&M Assessment
Figure 3.2 Water Levels in B-3 VEWs Following July 2002 Flood SWMU B-3 SVE O&M Assessment
List of Tables
Table 2.1 Initial Flow Rate Setting, January 6, 2000 SWMU B-3 SVE O&M Assessment
Table 2.2 TVH Estimated Levels at Initial System Settings, January 6, 2000 SWMU B-3 SVE O&M Assessment
Table 2.3 Schedule of Completed O&M Activities, SWMU B-3 SVE O&M Assessment
Table 3.1 Initial Soil Gas for O&M Task and Previous Pilot Test Events, SWMU B-3 SVE O&M Assessment
Table 3.2 Extraction Pressure Results and Blower Operating Parameters from Bi-weekly System Checks SWMU B-3 SVE O&M Assessment
Table 3.3 Monthly Flow Rates from Individual VEWs and Main Exhaust SWMU B-3 SVE O&M Assessment
Table 3.4 Field Screening Results from Monthly Soil Gas Screening Activity SWMU B-3 SVE O&M Assessment
Table 3.5 VMP Field Screening Results SWMU B-3 SVE O&M Assessment
Table 3.6 Analytical Results and Removal Rates for Volatile Organic Contaminants SWMU B-3 O&M Assessment
Table 3.7 Comparison of Removal Rates Over Time SWMU B-3 SVE O&M Assessment
Table 3.8 Contaminant Concentration in Exhaust Emissions SWMU B-3 SVE O&M Assessment
Table 3.9 Water Levels in VEWs Following July 2002 Flood SWMU B-3 SVE O&M Assessment Report
Table 3.10 Summary of Groundwater Sample Results from B-3 VEWs SWMU B-3 SVE O&M Assessment