[Home] [Master Table of Contents]
Soil Vapor Extraction Test Report for SWMU B-3, November 2001
Table of Contents
1.2 Investigation Objectives and Scope
Section 2 - Site and Study Background
2.2 Site Background and History
Section 3 - Treatability Study Methods
3.2 System Construction Activities
3.2.1 Expanded System and Design
3.3 Treatability Study Activities
Section 4 - Treatability Study Results and Data Evaluation
4.1.1 Confirmation Soil Sample Data
4.1.2 Characterization Soil Sample Data from Newly Installed VEWs
4.3.1 Soil Gas Equilibration Time
4.3.2 Soil Gas Influence Observations
4.4 Subsurface Influence Findings
4.4.1 Multiple Configuration Test 1
4.5 Air Emission/Mass Removal Summary
4.6 Investigation Derived Waste Management Summary
Section 5 - Conclusions and Recommendations
5.2.1 Establishment of Cleanup Levels and Models
5.2.2 Full-Scale Design and Operating Parameters
Section 6 - References
Figures
Figure 2.3 Locations of Pilot Test and Expanded System (1997) Borings
Figure 2.4 Orientation of Geologic Cross-Section Locations, SWMU B-3
Figure 2.5 East-West Cross-Section, A-A’, SWMU B-3
Figure 2.6 East-West Cross-Section, B-B’, SWMU B-3
Figure 2.7 North-South Cross-Section, C-C’, SWMU B-3
Figure 2.8 Location of SWMU B-3 Relative to Nearby Groundwater Wells
Figure 2.9 Layout of the Installed SVE Pilot Test System
Figure 2.10 Instrumentation Diagram for Installed SVE Blower System, SWMU B-3
Figure 2.11 SVE Air Contaminant Emission Rates from 1996 Pilot Test Activities, SWMU B-3
Figure 3.1 As-Built Expanded SVE System Layout, SWMU B-3
Figure 3.2 Typical Vapor Extraction Well Construction Detail
Figure 4.1 Revised Delineation of Treatment Area at SWMU B-3
Figure 4.2 Contour Map of TCE in Soil
Figure 4.3 Contour Map of cis-1,2-DCE in Soil
Figure 4.4 Contour Map of PCE in Soil
Figure 4.5 Pressure Responses and Soil Gas Changes Observed During MCT-1, SWMU -3
Figure 4.6 Soil Gas Changes Observed During Hydrocarbon Recovery Test
Figure 4.7 Oxygen Utilization at VEW-01, SWMU B-3
Figure 4.9 Pressure Response and Soil Gas Changes Observed During MCT-1, SWMU B-3
Figure 4.10 Pressure Response and Soil Gas Changes Observed During MCT-2, SWMU B-3
Figure 4.11 Pressure Responses and Soil Gas Changes Observed During MCT-3 - October 2001
Figure 5.1 Locations of Additional VEWs for an Expanded SVE System, SWMU B-3
Table 2.1 1996 Initial Pilot Test Analytical Results for Soil Samples SWMU B-3
Table 2.2 Geotechnical and Physical Property Results of Initial Pilot Test Soil Samples, SWMU B-3
Table 2.4 Analytical Results of Initial Soil Gas Chemistry from 1996 Pilot Testing Activities, SWMU B-3 Camp Stanley Storage Activity, Texas
Table 3.3 1997 Treatability Study Sampling Summary SWMU B-3 Camp Stanley Storage Activity, Texas
Table 4.2 Analytical Data from 1997 Soil Analysis, Expanded SVE System Activities
Table 4.3 Geotechnical Data from 1997 Soil Testing, SWMU B-3
Table 4.4 Analytical Data from 1997 Soil Gas Testing Events
Table 4.5 Contaminant Removal Rates in Exhaust, January 1997 System Check, Pilot Test Configuration
Table 4.6 Biological Activity Indicator Testing Results
Table 4.8 Contaminant Concentration in Exhaust, MCT-1
Table 4.9 TVH Removal in Wells During MCT-1
Table 4.10 Contaminant Concentration in Exhaust, MCT-2
Table 4.11 TVH Removal in Wells During MCT-2
Table 4.12 Contaminant Concentrations in Exhaust, MCT-3
Table 4.13 TVH Removal in Wells During MCT-3
Table 5.1 Estimated Costs for SVE Treatability System Installation and Testing, SWMU B-3
Table 5.2 Summary of Recommendations for Continued SVE, SWMU B-3
Appendices