SWMU B-3 - Table of Contents

[Home] [Master Table of Contents]

[Volume 1-2 Table of Contents]

SWMU B-3 Links

SWMU B-3 View Facing North - January 1999

Site Status: Open

Background

bullet

Description in Current Conditions Report (July 1999)

bullet

Chronology

bullet

Aerial Photograph

Plans (Volume 1-2)

bullet

SVE Test Work Plan (February 1996) (not available electronically)

bullet

Addendum to SVE Test Work Plan (December 1996)

bullet

RL74 and RL83 RFI Work Plan Addendum (August 1999)

bullet

Soil Vapor Extraction Work Plan, Second Addendum (December 1999)

bullet

RL17 Work Plan Amendment for Data Quality Rework (May 2000)

bullet

DO 23 Work Plan Addendum (July 2002)

bullet

Final Removal Action Report (April 2008)

Investigation Reports (Volume 3-1)

bullet

Section 4 of Technical Memorandum on Surface Geophysical Surveys, Well 16 Source Characterization (June 1995)

bullet

Section 5 of the Technical Memorandum on Soil Boring Investigation (June 1995)

bullet

Addendum to Technical Memorandum on Soil Boring Investigation (August 1995)

bullet

Section 3, Technical Memorandum on Soil Gas Surveys (June 1996)

bullet

Section 7, SWMU B-3 Characterization, Groundwater Investigation and Associated Source Characterizations Report (June 1996)

bullet

Soil Gas Survey Results, January - February 2001

bullet

SWMU B-3 Interim Remedial Action Completion Report (March 2005)

bullet

SWMU B-3 Bioreactor Construction Report (February 2007)

bullet

Final Groundwater Pumping Tests for Wells CS-MW16-LGR and CS-MW16-CC (September 2007)

bullet

Bioreactor Operations Performance Status Report, May - July 2009 (October 2009)

bullet

Final Flood Test Assessment Report (February 2010)

bullet

Biannual UIC Status Report for B-3 Bioreactor, November, 2009 - April, 2010

bullet

Biannual Bioreactor UIC Status Report (May 2010)

bullet

Bioreactor Operations Annual Performance Status Report, May - April 2010 (August 2010)

bullet

Quarter 13 Bioreactor Performance Status Report (September 2010)

bullet

Final DO 50 B-3 New Wells Technical Memorandum (October 2010)

bullet

Bioreactor UIC Status Report (November 2010)

bullet

CSSA B-3 Bioreactor Operations Annual Performance Status Report (Quarter 13 – Quarter 16, May 2010 – April 2011) (August 2011)

bullet

Final B-3 Bioreactor O&M Manual (November 2010 Update)

bullet

Bioreactor UIC Status Report (November 2010)

bullet

Final Quarter 14 Bioreactor Performance Status Report (February 2011)

bullet

CSSA B-3 Bioreactor Operations Annual Performance Status Report (Quarter 13 – Quarter 16, May 2010 – April 2011) (August 2011)

Tables

bullet

Table B3-1  Chemical Constituents Detected in Soil (March 1995)

bullet

Table B3-2  Chemical Constituents Detected in Groundwater (March 1995)

bullet

Table B3-3  Chemical Constituents Detected in Soil (February 1996)

bullet

Initial Flow Rate Setting, January 6, 2000 SWMU B-3 SVE O&M Assessment (April 2003)

bullet

TVH Estimated Levels at Initial System Settings, January 6, 2000 SWMU B-3 SVE O&M Assessment (April 2003)

bullet

Schedule of Completed O&M Activities,  SWMU B-3 SVE O&M Assessment (April 2003)

bullet

Initial Soil Gas for O&M Task and Previous Pilot Test Events, SWMU B-3 SVE O&M Assessment (April 2003)

bullet

Extraction Pressure Results and Blower Operating Parameters from Bi-weekly System Checks SWMU B-3 SVE O&M Assessment (April 2003)

bullet

Monthly Flow Rates from Individual VEWs and Main Exhaust SWMU B-3 SVE O&M Assessment (April 2003)

bullet

Field Screening Results from Monthly Soil Gas Screening Activity SWMU B-3 SVE O&M Assessment (April 2003)

bullet

VMP Field Screening Results SWMU B-3 SVE O&M Assessment (April 2003)

bullet

Analytical Results and Removal Rates for Volatile Organic Contaminants SWMU B-3 O&M Assessment (April 2003)

bullet

Comparison of Removal Rates Over Time SWMU B-3 SVE O&M Assessment (April 2003)

bullet

Contaminant Concentration in Exhaust Emissions SWMU B-3 SVE O&M Assessment (April 2003)

bullet

Water Levels in VEWs Following July 2002 Flood SWMU B-3 SVE O&M Assessment Report (April 2003)

bullet

Summary of Groundwater Sample Results from B-3 VEWs SWMU B-3 SVE O&M Assessment (April 2003)

Figures

bullet

Soil Analytical Results Map (March 1995)

bullet

Geophysical Anomaly Map (June 1995)

bullet

As-Built Expanded SVE System Layout SWMU B-3 SWMU B-3 SVE O&M Assessment (April 2003)

bullet

Water Level in VEW-01 and Daily Precipitation SWMU B-3 SVE O&M Assessment (April 2003)

bullet

Water Levels in B-3 VEWs Following July 2002 Flood SWMU B-3 SVE O&M Assessment (April 2003)

Boring Logs

bullet

SWMU B3-SB2 (March 1995)

bullet

SWUM B3-SB3 (March 1995)

bullet

SWMU B3-SB4 (March 1995)

bullet

SWMU B3-SB5 (March 1995)

bullet

SWMU B3-SB6 (March 1995)

bullet

SWMU B3-SB7 (March 1995)

Treatability Studies (Volume 4)

Biannual Status Report Months 55 – 60 (June 2012)
bullet

Soil Vapor Extraction Test Report for SWMU B-3 (November 2001)

bullet

Soil Vapor Extraction Operations & Maintenance Report (April 2003)

bullet

Final SWMU B-3 Bioreactor Operation & Maintenance Manual (July 2008)

bullet

Class V Underground Injection Well SWMU B-3 Bioreactor (July 2006)

bullet

SWMU B-3 Bioreactor Construction Report (February 2007)

bullet

Final SWMU B-3 Bioreactor Operation & Maintenance Manual (July 2010)

bullet

CSSA B-3 Extraction Well Construction Summary (September 2010)

bullet