Section 1 - Introduction

Section 2 - Site Conditions

2.1   Overview

2.2   Geology and Hydrogeology

2.3   Soil/Rock Analytical Results

2.4   Groundwater Analytical Results

2.5   Geophysical Testing Results

2.6   Soil Gas Testing Results

2.7   Initial Pilot Testing Results

Section 3 - Vapor Extraction Pilot Test Design

3.1   Selection of Test Site

3.2   Extraction Well Design

3.3   Pressure-Monitoring Point Design

3.3.1   Construction

3.3.2   Soil Sampling

3.3.3   Decontamination

3.3.4   Investigation-Derived Waste

3.4   Vacuum Blower, Piping and Instrumentation

3.4.1   Vacuum Blower

3.4.2   Piping and Instrumentation

3.5   Operation and Monitoring

3.5.1   Initial Diagnostic System Check

3.5 2   Hydrocarbon Recovery Test

3.5.3   Multiple Configuration Testing

3.5.4   Collection and Analysis of Soil Air/Exhaust Emissions

3.5.5   Biweekly and Monthly Monitoring Visits

3.6   Air Emissions

3.7   Data Analysis

Section 4 - Reporting Requirements

Section 5 - Performance Schedule

Figures

Figure 2.1   As-Built Expanded SVE System Layout SWMU B-3

Figure 2.2   Estimated Delineation of Treatment Area SWMU B-3

Tables

Table 5.1   Proposed Schedule for SWMU B-3 SVE O&M Assessment