[Home] [Master Table of Contents]
[Test Report] [SWMU B-3 Links]
Second Addendum to SVE Test Work Plan for SWMU B-3, December 1999
Table of Contents
2.3 Soil/Rock Analytical Results
2.4 Groundwater Analytical Results
2.5 Geophysical Testing Results
2.7 Initial Pilot Testing Results
Section 3 - Vapor Extraction Pilot Test Design
3.3 Pressure-Monitoring Point Design
3.4 Vacuum Blower, Piping and Instrumentation
3.5.1 Initial Diagnostic System Check
3.5 2 Hydrocarbon Recovery Test
3.5.3 Multiple Configuration Testing
Section 4 - Reporting Requirements
Section 5 - Performance Schedule
Figures
Figure 2.1 As-Built Expanded SVE System Layout SWMU B-3
Figure 2.2 Estimated Delineation of Treatment Area SWMU B-3
Tables