2.3 Soil/Rock Analytical Results
2.4 Groundwater Analytical Results
2.5 Geophysical Testing Results
2.7 Initial Pilot Testing Results
2.7.1 Initial Soil Gas Chemistry
2.7.2 Air Permeability Testing
Section 3 - Vapor Extraction Pilot Test Design
3.3 Pressure-Monitoring Point Design
3.4 Vacuum Blower, Piping and Instrumentation
Section 4 - Reporting Requirements
Section 5 - Performance Schedule
Figures
2.1 Anomaly Location Map, SWMU B-3
2.2 Chemical Constituents Detected at
"Hot Spot" Locations, SWMU B-32.3 Detailed Distribution of TCE in Soil Gas at SWMU B-3
Using Data Collected in the Fall of 19952.4 Detailed Distribution of PCE in Soil Gas at SWMU B-3
Using Data Collected in the Fall of 19952.5 Detailed Distribution of cis-1,2-DCE in Soil Gas
at SWMU B-3 Using Data Collected in the Fall of 19952.6 Locations of VEW and VMP Borings at SWMU B-3
and Cross Sections2.7 East-West Cross Section, SWMU B-3
2.8 East-West Cross Section, SWMU B-3
2.9 Anticipated Treatment Area, SWMU B-3
3.1 Layout of Installed SVE Pilot Test System for SWMU B-3
3.2 Proposed Layout of Expanded SVE Pilot Test System
3.3 Typical Vapor Extraction Well Construction Detail
Tables
2.1 Chemical Constituents of Concern Detected in Soil and Perched Groundwater
2.2 Analytical Results for Soil Samples at SWMU B-3
2.3 Geotechnical and Physical Property Results of Soil Samples Collected at SWMU B-3
2.4 Initial Soil Gas Chemistry, Screening Results, SWMU B-3
2.5 Initial Soil Gas Chemistry at SWMU B-3, Analytical Results
3.1 Methods of Chemical Analysis
3.2 Methods of Chemical Analysis
5.1 Proposed Schedule for SWMU B-3 SVE Expanded Pilot Study
Figures
2.1 Anomaly Location Map, SWMU B-3
2.2 Chemical Constituents Detected at SWMU B-3
2.3 Detailed Distribution of TCE in Soil Gas at SWMU B-3 Using Data Collected in the Fall of 1995
2.4 Detailed Distribution of PCE in Soil Gas at SWMU B-3 Using Data Collected in the Fall of 1995
2.6 Locations of VEW and VMP Borings at SWMU B-3 and Cross-Sections
2.7 East-West Cross-Section, SWMU B-3
2.8 East-West Cross-Section, SWMU B-3
2.9 Anticipated Treatment Area, SWMU B-3
3.1 Layout of Installed SVE Pilot Test System for SWMU B-3
3.2 Proposed Layout of Expanded SVE Pilot Test System