[Home] [Master Table of Contents]
Final B-20 Soil Stabilization/Solidification Treatability Study Report, May 2000
Table of Contents
Section 2 - Site and Study Background
2.2 Site Background and History
2.5 Statistical Evaluation of Background Metals Concentrations
2.6 Summary of Prior Investigation Results
2.7 Media and Contaminants of Concern
2.8 Determination of Cleanup Levels
Section 3 - Treatability Study Methods
3.4 Treatability Study Analysis
Section 4 - Treatability Study Results and Data Evaluation
4.0 Initial Baseline Soils Sample Data
4.1 System Performance Soils Sample Data
Section 5 - Analysis and Evaluation
5.2.1 Attainment of Cleanup Standards
5.2.2 Protection of Human Health and the Environment
5.2.3 Control the Sources of Releases
5.2.4 Short-Term Effectiveness
5.2.7 Reduction of Toxicity, Mobility, and Volume
5.2.9 Compliance with Waste Management Standards
Appendices
Appendix A Waste Analysis Plan
Appendix C Data Validation Report
Figures
Figure 2.2 CSSA Site Map and SWMU B-32, B-33 and B-20 Location
Tables
Table 2.1 Summary of Surface Soil Sampling Results for Heavy Metals
Table 2.2 Required TCLP Concentrations for Soils Removed
from its Original Site of Contamination