AOC 65 Treatability Test Plan (CDRL A015), April 2002
Table of Contents
2.2 Potential Sources of Contamination
2.3 Site Environmental Setting
2.4 Summary of Previous Investigations
2.6 Summary of Geophysical Results
Section 3 - Study Design and Construction
3.1 Groundwater Recharge Study
3.1.2 Piezometer Completion Details
3.2 Soil Vapor Extraction Systems
3.2.2.1 Extraction Well Design
3.2.2.2 Extraction Well Construction
3.2.2.3 Piping, Blower, and Instrumentation
Section 4 - SVE Treatability Testing System
4.2 SVE Treatability Testing Activities
Section 5 - Reporting Requirements
Appendices
Appendix A Geophysical Survey Results
Tables
Figure 2.1 Geophysical Survey Location Map
Figure 2.2 Location of Geophysical Anomalies
Figure 3.1 Location of Piezometers and SVE Wells
Figure 3.2 Typical Piezometer Construction Detail
Figure 3.3 Typical VEW Construction Detail – Building 90 Subslab Ventilation System
Figure 3.4 Proposed Piping for AOC 65 SVE and Building 90 Subslab Ventilation Systems
Figure 3.5 Typical Blower System Instrumentation Diagram – Building 90 Subslab Ventilation System
Figure 3.6 Typical VEW Construction Detail – AOC 65 SVE System
Figure 3.7 Typical Blower System Instrumentation Diagram –
AOC 65 SVE System
Figure 3.8 Typical VMP Construction Detail – AOC 65 SVE System
Tables
Table 3.1 Groundwater Recharge Study, Proposed Borehole Completion Summary
Table 3.2 AOC 65 SVE System, Proposed Borehole Completion Summary for VEWs
Table 3.3 AOC 65 SVE System, Proposed Borehole Completion Summary for VMPs