Well Installation Report - Wells CS-MW11A through CS-MW19 and Westbays 01 through 04, August 2004
Table of Contents
1.3 Objectives and Scope of Investigation
Section 2 - Well Installation Methodology
2.2 Determination of Well Locations
2.3.1 Original TO42 Statement of Work (September 2001)
2.3.2 TO42 Modification 01, July 2002
2.3.3 TO42 Modification 02, September 2002
2.4 Monitoring Well Construction
2.5.1 Westbay Borehole Construction
2.8 Geophysical and Hydrophysical Logging
2.9 Discrete Interval Groundwater Sampling
2.10 Monitoring Well Development
Section 3 - Chronological Field Narratives
3.1 Upgrades and Refurbishments to Existing Wells
3.4 Multi-Port Well Installation
Section 4 - Results and Interpretation
4.2 Discrete Interval Groundwater Sampling
Section 5 - Conclusions and Recommendations
5.2.2 Installation of New Wells
5.2.3 Multi-Port Monitoring Systems
Appendices
Appendix C COLOG Hydrophysical and Geophysical Logging Results Report
Appendix E Analytical Data Summary
Figures
Figure 4.1 CS-MW18-LGR Discrete Interval Groundwater Sampling Chart
Figure 4.2 CS-MW19-LGR Discrete Interval Groundwater Sampling Chart
Figure 4.3 CS-MW12-LGR and -CC Discrete Interval Groundwater Sampling Chart
Figure 4.4 CS-MW1-BS and -CC Discrete Interval Groundwater Sampling Chart
Figure 4.5 CS-MW2-BS and -CC Discrete Interval Groundwater Sampling Chart
Figure 4.6 CS-MW11A-LGR and -MW11B-LGR Discrete Interval Groundwater Sampling Chart
Figure 4.7 CS-MW16-CC Discrete Interval Groundwater Sampling Chart
Figure 4.8 CS-WB01 Discrete Interval Groundwater Sampling Chart
Figure 4.9 CS-WB02 Discrete Interval Groundwater Sampling Chart
Figure 4.10 CS-WB03 Discrete Interval Groundwater Sampling Chart
Figure 4.11 RFR-10 Discrete Interval Groundwater Sampling Chart
Figure 4.12 CS-WB04 Discrete Interval Groundwater Sampling Chart
Figure 4.13 Summary of CS-WB01 Hydrophysical Logs During Ambient Flow Test
Figure 4.14 Summary of CS-WB01 Hydrophysical Logs During Low-Rate Production
Figure 4.15 Summary of CS-WB02 Hydrophysical Logs During Ambient Flow Test
Figure 4.16 Summary of CS-WB02 Hydrophysical Logs During Low-Rate Production
Figure 4.17 Summary of CS-WB03 Hydrophysical Logs During Ambient Flow Test
Figure 4.18 Summary of CS-WB03 Hydrophysical Logs During Low-Rate Production
Figure 4.19 Summary of CS-WB04 Hydrophysical Logs During Ambient Flow Test
Figure 4.20 Summary of CS-WB04 Hydrophysical Logs During Low-Rate Production
Tables
Table 2.1 List of Wells Installed or Upgraded Under TO42
Table 2.2 New Well Locations and Rationale for Their Location
Table 2.3 Transducer Locations and Depths
Table 3.1 TO42 Well Installation Summary
Table 4.1 Summary of TO42 Geophysical and Video Logs
Table 4.2 TO42 Discrete Interval Groundwater Samples July 2002 through July 2003
Table 4.3 CS-MW18-LGR Discrete Interval Groundwater Sampling Results
Table 4.4 CS-MW19-LGR Discrete Interval Groundwater Sampling Results
Table 4.5 CS-MW12-LGR Discrete Interval Groundwater Sampling Results
Table 4.6 CS-MW12-CC Discrete Interval Groundwater Sampling Results
Table 4.7 CS-MW1-BS Discrete Interval Groundwater Sampling Results
Table 4.8 CS-MW1-CC Discrete Interval Groundwater Sampling Results
Table 4.9 CS-MW2-BS and -CC Discrete Interval Groundwater Sampling Results
Table 4.10 CS-MW11A-LGR Discrete Interval Groundwater Sampling Results
Table 4.11 CS-MW11B-LGR Discrete Interval Groundwater Sampling Results
Table 4.12 CS-MW16-CC Discrete Interval Groundwater Sampling Results
Table 4.13 CS-WB01 Discrete Interval Groundwater Sampling Results
Table 4.14 CS-WB02 Discrete Interval Groundwater Sampling Results
Table 4.15 CS-WB03 Discrete Interval Groundwater Sampling Results
Table 4.16 RFR-10 Discrete Interval Groundwater Sampling Results
Table 4.17 CS-WB04 Discrete Interval Groundwater Sampling Results