[Home]
[On-Post Quarterly GW Reports]
Final March 2005 On-Post Quarterly Groundwater Monitoring Report, July 2005
Table of Contents
1.0 - Water Level Measurements
2.0 - Basewide Flow Direction and Gradient
3.0 - Weather Station and Transducer Data
4.0 - Westbay�-Equipped Well Results
4.4 Profile Measurements
5.0 - March 2005 Analytical Results
5.1 Volatile Organic Compound Results
5.1.1 Toluene and Methylene Chloride Detections
5.1.2 MCL Exceedances in Monitoring Wells
Appendices
Appendix A Evaluation of Data Quality Objectives Attainment
Appendix B March 2005 Quarterly On-Post Groundwater Monitoring Analytical Results
Appendix C On-post Cumulative Analytical Results
Tables
Table 1-1 Summary of Groundwater Elevations, March 2005
Table 1-2 Comparison of Groundwater Elevations from December 2004 to March 2005
Table 4-1 Combines Results from Westbay�-Equipped Wells
Table 5-1 March 2005 Quarterly Groundwater Detected Concentrations
Figures
Figure 2-1 March 2005 Potentiometric Surface Map, LGR Wells Only
Figure 2-2 March 2005 Potentiometric Surface Map, BS Wells Only
Figure 2-3 March 2005 Potentiometric Surface Map, CC Wells Only
Figure 2-5 March 2005 Potentiometric Surface Map for the LGR Screened Wells
Figure 2-6 Groundwater Elevations and Precipitation Data for Selected Wells
Figure 4-1 CS-WB01 Combined Concentration, Water Level, and Rainfall Data
Figure 4-2 CS-WB02 Combined Concentration, Water Level, and Rainfall Data
Figure 4-3 CS-WBO3 Combined Concentration, Water Level, and Rainfall Data
Figure 4-4 CS- WB04 Combined Concentration, Water Level, and Rainfall Data
Figure 5-1 Concentrations of SelectedAnalytes
Figure 6-1 PCE Concentrations for LGR Wells, March 2005
Figure 6-2 TCE Concentrations for LGR Wells, March 2005
Figure 6-3 cis-1,2-DCE Concentrations for LGR Wells, March 2005
Figure 6-4 cis1,2-DCE Concentrations for BS Wells, March 2005
Figure 6-5 PCE Concentrations for CC Wells, March 2005
Figure 6-6 TCE Concentrations for CC Wells, March 2005
Figure 6-7 cis-1,2-DCE Concentrations for CC Wells, March 2005