[Home]
[SWMU B-5]
Final SWMU B-5 RCRA Facility Investigation/Closure Report - June 2002
Table of Contents
1.1 Background and Site Description
1.2 Site Environmental Setting
Section 2 - Field Investigation
Section 3 - Conclusions and Recommendations
3.2 Evaluation of Data Quality Objectives Attainment
Appendices
Appendix A Analytical Results Summary
Appendix
B Data Verification Reports
Appendix
C Evaluation of Data Quality Objectives Attainment
Figures
Figure B5-2 Site Soils and Topographic Map
Figure B5-4 Sample Location Map
Figure B5-5 Electromagnetic Data In-Phase
Figure B5-6 Electromagnetic Data Quadrature Phase
Tables
Table B5-1 SWMU B-5 Summary of Chemical Constituents Detected in Soil, March 2002