Cover Page

Section 1 - Introduction

1.1   Purpose and Scope

1.2   Site Location and History

1.3   Geology and Hydrogeology

Section 2 - Field Investigation

2.1   Project Objectives

2.2   Field Actions

2.2.1   Site Preparation Activities

2.2.2   Removal of the Existing SVE System

2.2.3   Removal of Cover Material

2.2.4   Soil and Waste Material Stockpiles

2.2.5   Analytical Program

2.2.6   Sampling Procedures

2.2.7   Quality Assurance/Quality Control

2.2.8   Borrow Source Sample

2.2.9   Waste Characterization of Stockpiled Material

2.2.10   Waste Characterization - West Trench

2.2.11   Waste Excavation and Soil Sampling - East Trench

2.2.12   Surveying

2.2.13   Waste Handling and Demobilization

2.3   Results and Comparisons

2.3.1   Borrow Source Sample

2.3.2   Waste Characterization of Stockpiled Material

2.3.4   Waste Excavation and Soil Sampling - East Trench

Section 3 - Conclusions and Recommendations

3.1   Conclusions

3.2   Evaluation of Data Quality Objectives Attainment

3.3   Recommendations

Figures

Figure SWMU B3-1   Site Location Map

Figure SWMU B3-2   SWMU B-3 Western Trench Sample Points

Figure SWMU B3-3   SWMU B-3 Eastern Trench Sample Points

Tables

Table SWMU B3-1   Summary of Backfill Certification Results

Table SWMU B3-2   Summary of Waste Characterization Results

Table SWMU B3-3   Summary of Closure Certification Results

Appendices

Appendix A   Summary of Analytical Results

Appendix B   Data Quality Summary

Attachment 1 - Data Validation Reports

Appendix C   Evaluation of Data Quality Objectives Attainment

Appendix D   West Trench Investigation

Appendix E   Waste Disposal Documentation

Appendix F   Site Photographs