[Home]]
[SWMU B-3]
Interim Remedial Action Completion Report, March 2005
Table of Contents
1.1 Purpose and Scope
1.2 Site Location and History
1.3 Geology and Hydrogeology
Section 2 - Field Investigation
2.1 Project Objectives
2.2 Field Actions
2.2.1 Site Preparation Activities
2.2.2 Removal of the Existing SVE System
2.2.3 Removal of Cover Material
2.2.4 Soil and Waste Material Stockpiles
2.2.5 Analytical Program
2.2.6 Sampling Procedures
2.2.7 Quality Assurance/Quality Control
2.2.8 Borrow Source Sample
2.2.9 Waste Characterization of Stockpiled Material
2.2.10 Waste Characterization - West Trench
2.2.11 Waste Excavation and Soil Sampling - East Trench
2.2.12 Surveying
2.2.13 Waste Handling and Demobilization
2.3 Results and Comparisons
2.3.1 Borrow Source Sample
2.3.2 Waste Characterization of Stockpiled Material
2.3.4 Waste Excavation and Soil Sampling - East Trench
Section 3 - Conclusions and Recommendations
3.1 Conclusions
3.2 Evaluation of Data Quality Objectives Attainment
3.3 Recommendations
Figures
Figure SWMU B3-1 Site Location Map
Figure SWMU B3-2 SWMU B-3 Western Trench Sample Points
Figure SWMU B3-3 SWMU B-3 Eastern Trench Sample Points
Tables
Table SWMU B3-1 Summary of Backfill Certification Results
Table SWMU B3-2 Summary of Waste Characterization Results
Table SWMU B3-3 Summary of Closure Certification Results
Appendices
Appendix A Summary of Analytical Results
Appendix B Data Quality Summary
Appendix C Evaluation of Data Quality Objectives Attainment
Appendix D West Trench Investigation