[Home]

[AOC 37]

AOC 37 - RCRA Facility Investigation/Closure Report, June 2004

Table of Contents

Section 1 - Introduction

1.1   Closure Standard

1.2   Background and Site Description

1.2.1   CSSA

1.2.2   AOC-37

1.2.2.1   Site Description

1.2.2.2   Potential Sources of Contamination

1.2.2.3   Site Location

1.3   Environmental Setting

1.3.1   Site Soils and Topography

1.3.2   Geology

1.3.3   Hydrology

1.3.4   Cultural Resources

1.3.5   Potential Receptors

1.4    Previous Investigation Results

Section 2 - Closure Certification

2.1   Conclusions and Recommendations

2.2   Closure Certification

Figures

Figure AOC37-1   AOC-37 Soil Gas Sampling Locations

Figure AOC37-2   Detections of PCE at AOC-37, Dec 99.

Figure AOC37-3   AOC-37 Site Location Map

Figure AOC37-4   AOC-37 Aerial Photographs

Figure AOC37-5   Soils and Topographic Map

Figure AOC37-6   Geologic Setting

Figure AOC37-7   PCE Soil Gas Survey Results, December 1999

Appendices

Appendix A   Evaluation of Data Quality Objectives Attainment