[Home]

[SWMU O-1]

Interim/Stabilization Measures and Partial Facility Closure Report for SWMU O-1

Table of Contents

Section 1 - Introduction

1.1   Background

1.2   Site Description

1.3   Previous Investigations

1.4   Interim Measures and Closure Standard

Section 2 - Field Investigation

2.1   Site Interim Measures and Closure Evaluations

2.2   Field Actions

2.2.1   Objectives

2.2.2   Methods

2.2.3   Synopsis of the Interim/Stabilization Measures

2.3   Results and Comparisons

2.4   Operation and Maintenance

Section 3 - Conclusions

3.1   Conclusions

3.2   Certification

Section 4 - References

Appendices

Appendix A   Inspection Summary Reports

Appendix B   Design Engineer’s Acceptance with As-Built Drawings

Appendix C   Copies of Field Data Sheets, Soil Boring Logs, Texas Non-hazardous Waste Manifest and Photographic Data Sheets

Appendix D   Laboratory Data Packages with Data Validation Reports

Figures

Figure SWMU O-1-1   Distribution of PCE in Soil Gas at SWMU O-1

Figure SWMU O-1-2   Location of IM Subsurface Soil Samples

Figure SWMU O-1-3   Generalized Extent of Excavation at SWMU O-1

Tables

Table SWMU O-1-1   Construction Specifications for Soil Components of Liner System

Table SWMU O-1-2   Shallow Soil Boring Analytical Results

Table SWMU O-1-2   Deep Soil Boring Analytical Results