[Home]
[SWMU O-1]
Interim/Stabilization Measures and Partial Facility Closure Report for SWMU O-1
Table of Contents
1.4 Interim Measures and Closure Standard
Section 2 - Field Investigation
2.1 Site Interim Measures and Closure Evaluations
Appendices
Appendix A Inspection Summary Reports
Appendix B Design Engineer’s Acceptance with As-Built Drawings
Appendix C Copies of Field Data Sheets, Soil Boring Logs, Texas Non-hazardous Waste Manifest and Photographic Data Sheets
Appendix D Laboratory Data Packages with Data Validation Reports
Figures
Figure SWMU O-1-1 Distribution of PCE in Soil Gas at SWMU O-1
Figure SWMU O-1-2 Location of IM Subsurface Soil Samples
Figure SWMU O-1-3 Generalized Extent of Excavation at SWMU O-1
Tables
Table SWMU O-1-1 Construction Specifications for Soil Components of Liner System