Partial Facility Closure Plan
B-20 Detonation Area
March 1994
Table of Contents
Section 2: Site History and Background
2.1 Installation Description and History
2.4 Standard Operating Procedures
2.5 Preliminary Sampling and Results
3.2 Closure Performance Standard
3.3.2 Baseline Risk Assessment
3.3.3 Corrective Measures Study
3.3.5 Closure Certification and Report
Section 4: Closure Investigation
4.2 Statistical Sampling Strategy
4.3.3 Subsurface Drilling and Sampling
4.3.4 Verification Sampling and Analysis
4.4 Data Evaluation and Reporting
4.5 Remedial Investigation Report
Section 5: Development of a Baseline Risk Assessment
Section 6: Development of Corrective Measures Study
Section 7: Implementation of Corrective Action
Section 8: Closure Report and Certification
Section 9: Closure Costs and Schedule
References (See Bibliography)
Appendix A: CSSA Standard Operating Procedures at B-20 (not available electronically)
Appendix B: RRAD Phase I Sampling and Analysis Plan
Appendix C: Quality Assurance Project Plan for the B-20 Remedial Investigation (not available electronically)
Appendix D: Preliminary Sampling Analytical Results (not available electronically)