SWMU B-8 Table of Contents

[Home] [Master Table of Contents]

[Volume 1-2 Table of Contents]

SWMU B-8 Links

SWMU B-8 View Facing West - January 1999

Site Status: Active Range

Background

bullet

Description in Current Conditions Report (July 1999)

bullet

Chronology

bullet

Aerial Photograph

bullet

Figure B8-1 Plan View Map

Plans (Volume 1-2)

bullet

RL17 & 33 RFI Work Plan

bullet

RL74 Interim Measures Work Plan (August 1999)

bullet

RL83 RFI Work Plan

bullet

RL17 & 33 Work Plan Amendment for Data Quality Rework

bullet

TO0019 Work Plan Addendum

bullet

Final Work Plan Addendum for SWMUs B-2 and B-8 (May 2010)

Investigation Reports (Volume 3-1)

bullet

List of Relevant Previous Investigation Reports

bullet

Section 3 of Technical Memorandum on Geophysical Surveys (October 1995)

bullet

RCRA Facility Investigation Report (April 2002)

bullet

RCRA Facility Investigation Report Addendum (December 2003)

Tables

bullet

Table B8-1  Summary of Constituents Detected in Soils (March 2000)

bullet

Table B8-2  Summary of Constituents Detected in Stockpiled Soils (April 2000)

bullet

Table B8-3  Summary of Constituents Detected in Soils (March 2003)

bullet

Table B8-4  Summary of Lead Concentrations from Palintest Field Test Kits (May 2003)

Figures

bullet

Geophysical Anomaly Map

bullet

Figure B8-1  Site Location Map

bullet

Figure B8-2  Soils and Topographic Map

bullet

Figure B8-3  Geologic Setting

bullet

Figure B8-4  Sample Location Map

bullet

Figure B8-5  Aerial Photographs

bullet

Figure B8-6  Surface Soil Sample Location Map

bullet

Figure B8-7  Geophysical Survey Results

Boring Logs

bullet

B8-SB1 through B8-SB3 (August 1996)