[Home] [Master Table of Contents]
Final AOC 65 Interim Removal Action Report, August 2003
Table of Contents
Section 2 - Investigation Activities Section 3 - Response Actions3.1 Building 90 Interim Removal Actions
3.2 Post-Excavation Confirmation Sampling
3.3 Restoration
Section 4 - Conclusions and Recommendations4.0 Conclusions
4.1 Recommendations
Figures
Figure 2-1 Building 90 Soil Boring
Locations and Excavation Area
Figure 2-2 AOC-65 Soil Boring Locations with Soil/Rock Sample Analytical Results
for PCE
Figure 2-3 AOC-65 Soil Boring Locations with Soil/Rock Sample Analytical Results
for TCE
Figure 2-4 AOC-65 Soil Boring Locations with Soil/Rock Sample Analytical Results
for PCBs
Figure 2-5 AOC-65 Soil Boring Locations with Soil/Rock Sample Analytical Results
for Metals
Figure 3-1 Building 90 Confirmation Sample Locations and Excavation Area
Figure 3-2 Site
Restoration As-Built
Figure 3-3 Miscellaneous Installation Details
Tables
Table 2-1 Characterization Soil
Borings Analyte Detection Summary, April 2002
Table 2-2 Analyte Detection Summary, March and April
2001
Table 2-3 Analyte Detection Summary, April 2002
Table 3-1 Confirmation Sampling Analytical Results
Appendices
Appendix A Soil Profile Descriptions
Appendix B Sample Chain of Custody Form and
Analytical Results