[Home] [Master Table of Contents]

[Report Table of Contents] [Next Section]

June 2002 Off-Post Quarterly Groundwater Monitoring Report

Section 1 - Introduction

Off-post groundwater monitoring scoped under the Air Force Education Training Center (AETC) Contract F41689-96-D-0710, Delivery Order (DO) 5084, was performed during the week beginning June 10, 2002. Groundwater monitoring conducted under this DO began in September 2001 and continues contractually through the June 2002 sampling event. Twenty samples per quarter were funded under DO 5084. Additional samples are funded under Air Mobility Command (AMC) Contract number F11623-94-D0024, RL83. Air Force Center for Environmental Excellence/Environmental Restoration Directorate (AFCEE/ERD) and AFCEE/Environmental Restoration Consultant (ERC) provide technical oversight of the groundwater monitoring program with the consent of Camp Stanley Storage Activity (CSSA).

The primary objective of the off-post groundwater monitoring program is to determine whether concentrations of chlorinated volatile organic compounds (VOCs) detected in off-post wells exceed safe drinking water standards. A secondary objective of the off-post groundwater monitoring program is to determine the lateral and vertical extent of the contaminant plume associated with past releases near Building 90 (Area of Concern [AOC]-65) or from Solid Waste Management Unit (SWMU) B-3. A subsidiary objective of the off-post groundwater monitoring is to assess whether there are apparent trends (decreasing or increasing) in contaminant levels over time in the sampled wells.

CSSA was required by the Resource Conservation Recovery Act (RCRA) 3008(h) Administrative Order on Consent (Order) issued by the Environmental Protection Agency (EPA) on May 5, 1999, to identify and locate both privately and publicly owned groundwater wells within ��mile of CSSA. As part of its ongoing groundwater monitoring program, CSSA extended the sampling of off-post wells beyond the �-mile boundary required under the Order. The Offsite Well Survey Report (Parsons, August 2001) was submitted to fulfill this requirement. Additional background information on locating and identifying off-post private and public water supply wells is located in the CSSA Environmental Encyclopedia (Volume 5, Groundwater). All off-post wells previously sampled are shown on Figure 1.1, including off-post wells sampled in the June 2002 event.

Monitoring for both on- and off-post groundwater is being conducted at CSSA. Selected off-post wells were initially sampled in 1995. The quarterly off-post groundwater monitoring program was initiated in September 2001 in accordance with the Off-Post Monitoring Program and Response Plan (Plan) (CSSA, June 2002). On-post groundwater monitoring was initiated in 1992 in response to VOC contamination detected in CSSA drinking water supply well CS-16 and continued periodically until the CSSA quarterly groundwater monitoring program for on-post wells was initiated in December 1999. Results from on-post groundwater sampling are presented in the June 2002 On-Post Quarterly Groundwater Monitoring Report (Parsons, 2002).

Action levels for detection of VOCs and decisions to sample an off-post private well are based on the following: 

If VOC contaminant levels are ≥90 percent of the maximum contaminant level (MCL) based on preliminary data received from the laboratory (≥4.5 micrograms per liter [�g/L] for tetrachloroethene [PCE] and trichloroethene [TCE]) and the well is used as a potable water source, bottled water will be supplied within 24 hours of receipt of the data, and a confirmation sample will be collected from the well within 14 days of receipt of the final validated analytical report. If the follow-up sampling confirms contaminants of concern (COC) are above 90 percent of the MCLs, the well will be evaluated and either installation of an appropriate method for wellhead treatment or connection to an alternative water source will be performed. Costs related to the installation and maintenance of wellhead treatment equipment or connection to an alternative water source will be borne by CSSA.

If VOC contaminant levels are ≥80 percent of the MCL during any single monitoring event based on preliminary data from the laboratory (4.0 �g/L for PCE and TCE) and the well is used as a potable water source, it will be monitored monthly. If the follow-up sampling confirms that COCs are ≥80 percent of the MCL, it will continue to be re-sampled until the VOC levels fall below the 80 percent value.

If any VOC COC is detected at levels ≥the method detection limit (MDL) (historically 0.11 �g/L for PCE and 0.14 �g/L for TCE), and <80 percent of the MCL, the well will be re-sampled on a quarterly basis. This sampling will be conducted concurrently with on-post sampling events and will be used to develop historical trends in the area. Quarterly sampling will continue for a minimum of one year, after which the sampling frequency will be reviewed and possibly decreased.

If VOCs are not detected during the initial sampling event (i.e., no VOC contaminant levels above the MDL), further sampling of the well would be considered. A well with no detectable VOCs may be removed from the sampling list. However, if analytical data suggests future plume migration could influence the well, it will be resampled as needed. The well owner, EPA, and the Texas Commission on Environmental Quality (TCEQ), the regulatory agency formerly known as the Texas Natural Resource Conservation Commission (TNRCC), will be apprised of any re-sampling decisions regarding the non-detect wells.

For wells where a wellhead treatment system has been installed, post treatment samples will be collected and analyzed after initial system start-up and at six-month intervals to confirm the system is effectively removing VOCs.

The total number of off-post wells sampled in June 2002 was 25. Sampling of 23 wells was scoped under the current funding mechanism (AETC Contract F41689-96-D-0710, DO 5084) and two wells were sampled under AMC Contract F11623-94-D0024, RL83.

An evaluation of the Data Quality Objectives (DQOs) for CSSA�s groundwater monitoring program is presented in Appendix A. The objectives listed in Appendix A also reference appropriate sections of the 3008(h) Order. Overall DQOs for the groundwater investigations at CSSA are provided in Volume 1-1 behind the RCRA Facility Investigation (RFI) Addendum Tab (Section 11). A comprehensive summary of the results from the June 2002 off-post groundwater sampling event is presented in Appendix B, and abbreviated tables showing only the detected compounds are included in the groundwater results discussion in Section 3 of this report. The cumulative historical results including cations and anions data from off-post groundwater sampling by CSSA are presented in summary tables located in Volume 5, Groundwater, Introduction to the Quarterly Groundwater Monitoring Program (Table 8 and Table 9). Table 8 presents the Off-Post Groundwater VOC Analytical Results, and Table 9 presents the Off-Post Groundwater Metals Analytical Results. The laboratory data packages and associated data validation reports for this sampling event are submitted to AFCEE and CSSA separately from this report. A summary of the objectives and sampling rationale for the selection of wells for the June 2002 groundwater monitoring event is included in Table 1.1.

[Next Section]