Construction Quality Assurance Plan
for ESTCP Project 200020
PIMS-Remediation of Soil Contaminated with Lead,
June 2001

Table of Contents

Section 1 - Introduction

1.1   Test Cell Description

1.2   Test Cell Construction Procedures

Section 2 - Responsibility and Authority

2.1   Owner

2.2   Design Engineer

2.3   CQA Personnel

2.4   Construction Contractor

Section 3 - Project Meetings

3.1   Preconstruction CQA Meetings

3.2   Daily Progress Meetings

3.3   Problem or Work Deficiency Meeting

Section 4 - Personnel Qualifications

4.1   CQA Officer

4.2   CQA Staff

4.3   Consultants

Section 5 - Inspection Activities

5.1   General Preconstruction Activities

5.2   Geomembrane Liner

5.2.1   Preconstruction

5.2.2   Construction

5.2.3   Welder Certification And Testing

5.2.4   Seaming

5.2.5   Postconstruction

5.3   Leachate Collection System

5.3.1   Preconstruction

5.3.2   Postconstruction

5.4   Sampling

5.5   Acceptance Criteria

5.6   Treatment Of An Outlier

5.7   Corrective Measures

5.8   Documentation  

5.9   Daily Recordkeeping

5.9.1   Inspection Data Sheets 

5.9.2   Problem Identification and Corrective Measures

5.9.3   Photographic Reporting Data Sheets

5.10   Acceptance of Completed Components

5.11   Final Documentation

Tables

Table 1   Methods For Testing Geomembrane Liner

Table 2   Acceptance Criteria for Geomembrane Liner

Figures

Figure 1   PIMS Treatment Unit Detail

Figure 2   Daily Summary Report

Figure 3   Inspection Data Sheet

Figure 4   Problem Identification and Corrective Measures Report

Figure 5   Photographic Reporting Data Sheets