Construction Quality Assurance Plan
for ESTCP Project 200020
PIMS-Remediation of Soil Contaminated with Lead, June 2001
Table of Contents
1.2 Test Cell Construction Procedures
Section 2 - Responsibility and Authority
3.1 Preconstruction CQA Meetings
3.3 Problem or Work Deficiency Meeting
Section 4 - Personnel Qualifications
Section 5 - Inspection Activities
5.1 General Preconstruction Activities
5.3 Leachate Collection System
5.10 Acceptance of Completed Components
Tables
Table 1 Methods For Testing Geomembrane Liner
Table 2 Acceptance Criteria for Geomembrane Liner
Figures
Figure 1 PIMS Treatment Unit Detail
Figure 3 Inspection Data Sheet
Figure 4 Problem Identification and Corrective Measures Report