Addendum to Sampling and Analysis Plan Specific to Delivery Order DO23 - October 1996
Table of Contents
AFCEE Contract No. F41624-94-D-8136/0023
Data Item No. A001A
This addendum is to the Sampling and Analysis Plan (SAP) for the Air Mobility Command (AMC), Delivery Order RL17, Solid Waste Management Unit (SWMU) Closures at Camp Stanley Storage Activity and applies to tasks to be performed under the AFCEE Delivery Order 0023 groundwater evaluation, monitoring, and well installation project for CSSA. Tasks specified under this program include the following, with a reference to the appropriate project plan and the contract under which that plan was written:
Task | Reference Plan | Contract |
Installation of three 275 foot monitoring wells | Work Plan for Lower Glen Rose Monitoring Well Installation | Armstrong Laboratory/OEB, Contract F33615-89-D-4003, delivery order 67 |
Quarterly and waste stream sampling and analysis of water supply and monitoring wells | Sampling and Analysis Plan for SWMU Closures at Camp Stanley Storage Activity | U.S. Air Force Air Mobility Command (AMC), |
Upgrading two existing wells with new piping and acid or carbon dioxide treatment | Sampling and Analysis Plan for SWMU Closures at Camp Stanley Storage Activity | U.S. Air Force Air Mobility Command (AMC), |
The AMC RL17 SAP is composed of two parts - a Field Sampling Plan (FSP) and a Quality Assurance Project Plan (QAPP). Additions are made only to the FSP. The QAPP is accepted in its entirety.
Section 1 - Introduction and Field Operations
Section 2 - Environmental Sampling