1995

May

Geophysical survey was conducted at all the "open" areas within a 2,000-foot radius of well 16, including AOC 41. Found two anomalies. Anomaly A is subtle and is not related to known surface/subsurface features. Anomaly B is larger and may be related to additional underground metal piping or fragments.

Parsons ES

Order 67

June - July

Twelve soil-gas survey samples collected and analyzed for chlorinated and aromatic volatile organics. PCE was the only target analyte detected.

Parsons ES

Order 67

1999

December

Forty soil gas survey samples were collected and analyzed for chlorinated and aromatic volatile organics. PCE was the only target analyte detected.

Parsons ES

DO5068

2000

January

A soil gas survey was conducted at the site.

Parsons ES

DO5068

2003

December

Final TO 0019 Work Plan Addendum

submitted.

Parsons

TO19

2005

April

Final AOC 41 No Further Action Report

submitted.

Parsons

TO19

July

Closure approved by TCEQ.

TCEQ