[Home]

[AOC 35]

Area of Concern 35

Chronology of Actions/Investigations

Year

Month

Action/Results

Action Performed By

Project Number

1995

February

Site included in the seven potential source areas around well 16 for which EM and GPR geophysical surveys were performed. Overall, sixteen anomalies were found.

Parsons ES

Order 67

May

Increased area of EM geophysical surveys to approximately ½-mile radius around well 16; no anomalies found.

Parsons ES

Order 67

June-July

Twenty-one soil-gas survey samples collected and analyzed for chlorinated and aromatic volatile organics. PCE was the only target analyte detected.

Parsons ES 

 Order 67

August - September

Surface geologic mapping across CSSA and analysis of geophysical logs from water wells at and around CSSA. Mapped two distinct fault zones, one near well 16 and one north of well 1.

Parsons ES

Order 67

1996

January

Ground penetrating radar surveys performed around CSSA by Dr. Young. Seismic reflection survey from well 16 southeast to well 1 by Blackhawk Geosciences.

Parsons ES
AL/OEB
Charles Young, Geophysical Consultant
and Blackhawk Geosciences

Order 67

1999

December

Performed geophysical surveying using EM and GPR. No anomalies associated with waste management practices were found.

Parsons ES

DO5068

2001

April

Surface soil samples collected and analyzed for VOCs (PCE, TCE, DCE-isomers, carbon tetrachloride, and chloroform), AOC35-SS01 through AOC35-SS05 collected.

Parsons

O'Brian & Gere

DO 5068

2002

October

Final RCRA Facility Investigation/Closure Report submitted.

Parsons

DO 5068

2003

February

TCEQ approval of closure.

TCEQ

DO 5068