[Home

[SWMU F-14]

Solid Waste Management Unit F-14

Chronology of Actions/Investigations

Year

Month

Action/Results

Action Performed By

Project Number

1984

--

Operated a less-than-90-day hazardous waste storage facility identified as the F-14 point-of-accumulation site.

CSSA

NA

--

Began contracting transport and disposal actions to qualified contractors.

DRMO
Kelly AFB

NA

1984-1992

--

Disposed of drums and their contents produced by CSSA.

DRMO,
Kelly AFB

NA

1988-1991

--

Provided "Annual Waste Summaries" to TWC indicating disposal and testing of various wastes.

CSSA

NA

1990

--

PCE, oils, solvent, and nickel penetrate wastes completely removed from F-14 site.

CSSA

NA

1992

March

All other drums of wastes and storage pallets removed from F-14 site.

CSSA

NA

August

Contracted Parsons ES through AL/OEB to perform F-14 site assessment.

CSSA

NA

September

Drilled 10 soil borings for subsurface rock sampling; collected floor samples and a composite berm sample.

Parsons ES

Order 126

1993

February

Submitted F-14 assessment report to CSSA.

Parsons ES

Order 126

December

Sent TNRCC 90 working days notification of closure letter.

CSSA

NA

1994

April

Sent TNRCC 10 working days notification of closure field actions letter.

CSSA

NA

April

Collected 7 berm samples at F-14 for verification analytical testing. Collected 10 background rock samples for testing of nickel levels.

Parsons ES

Order 126

May

Analytical results did not indicate 1,1,1-TCA concentrations in the 7 berm samples. Total nickel levels in background rock samples were greater than those in F-14 subsurface rock samples.

National Environmental Testing, Inc.

Order 126

June

Disposed of investigation-derived wastewater, which contained only 1.7 mg/l TPH, less than the acceptable level (15 mg/l) for surface discharge under TNRCC PST Division guidance. Wastewater was disposed in the CSSA sanitary wastewater treatment facility.

Parsons ES

Order 126

October

Provided generator waste profile documentation to USPCI for disposal of soil/rock cuttings.

CSSA

NA

1995

February

Transported drum of soil/rock cuttings to USPCI class I landfill in Waynoka, OK.

USPCI

NA

April

Closure report submitted to TNRCC.

Parsons ES

Order 126

November

TNRCC approved final closure report.

TNRCC

NA