Unknown

Unknown

Sand and projectiles from the Building 90 test range used as pipe bedding. SWMU consists of bedding material only.

CSSA

NA

1996

February

Work Plan for B-33 Investigation submitted.

Parsons ES

RL17

March

EM geophysical survey performed on March 6. Four anomalies found all corresponding to non-waste management activities.

Parsons ES

RL17

Collected three surface soil samples (SS1-SS3) on March 8 and analyzed for explosives and metals. Analytical results are currently in question due to ITS Laboratory practices.

Parsons ES

ITS

RL17

1997

May

Completed three soil borings (SB1-SB3) on May 14 at the site. Analytical results are currently in question due to ITS Laboratory practices.

Parsons ES

ITS

RL17

July

Sand and shot investigation activities commenced and completed. The pipe was diverted, and shot and lead-contaminated sand was excavated and stockpiled. Approximately 100 cubic yards of soils were excavated. The trench was backfilled with clean sand. Four confirmatory soil samples were collected. Results are currently in question due to ITS Laboratory practices.

Parsons ES

ITS

UXB

RL33

1998

September

Submitted Waste Analysis Plan for disposal of trench material to TNRCC.

Parsons ES

RL33

1999

April

EPA memorandum indicated analytical results obtained from ITS are not usable for closure or compliance.

EPA

NA

May

Approximately 100 cubic yards of soil were successfully treated by solidification with Portland cement; to non-hazardous Class 2 levels. Soils were transported and disposed in accordance to applicable regulations.

Parsons ES

Eagle Const.

WMI-Covel Gardens

RL33

November

Submitted work plan for resampling to replace analytical chemistry data generated by ITS Laboratory.

Parsons ES

NA

2000

March

Advanced 3 soil borings (SB1-3) for Rework and collected 6 soil/rock samples for metals and explosives analysis.

Parsons ES

O’Brien & Gere

Data Chem

Rework

2002

August

Final RCRA Facility Investigation Report.

Parsons

RL17

2003

December

Final TO 0019 Work Plan Addendum

submitted.

Parsons

TO19

2004

March

Removed sand that was used as bedding material for utility lines. Collected 5 samples from excavated area  and analyzed for metals (Ba, Ni, Cd, Cr, Zn, and Pb).  Collected 1 waste characterization sample.

Parsons

TO19

May

Mixed excavated soils with PIMS.

Parsons

TO19

August

Final RCRA Facility Investigation/Closure Report

CSSA

TO19

November

Closure approved by TCEQ.

TCEQ