Solid Waste Management Unit B-31
Chronology of Actions/Investigations
Year |
Month |
Action/Results |
Action Performed By |
Project Number |
Unknown |
Unknown |
Sand and projectiles from building 90 test range used as pipe bedding. SWMU consists of bedding material only. |
CSSA |
NA |
1996 |
February |
Work Plan for B-31 investigation submitted. |
Parsons ES |
RL17 |
March |
EM geophysical survey performed on March 11; three anomalies found, all corresponding to non-waste management activities. |
Parsons ES |
RL17 |
|
Collected three surface soil samples (SS1-SS3) on March 12 and analyzed for explosives and metals. Analytical results are currently in question due to ITS Laboratory practices. |
Parsons ES |
RL17 |
||
August |
Completed three soil borings (SB1-SB3) on August 29 and 30 at the site. Analytical results are currently in question due to ITS Laboratory practices. |
Parsons ES |
RL17 |
|
1997 |
July |
Investigation activities were conducted. The pipe was diverted, and seven test pits were dug along the line to identify lead and shot contamination. No shot or other evidence of waste material was found. Seven confirmatory soil samples were collected (one from each test pit). Results are currently in question due to ITS Laboratory practices. |
Parsons ES |
RL33 |
1999 |
April |
EPA memorandum indicated analytical results obtained from ITS are not usable. |
EPA |
NA |
November |
Submitted work plan for resampling to replace analytical chemistry data generated by ITS Laboratory. |
Parsons ES |
NA |
|
2000 |
March |
Collected 3 surface soil samples for Rework (SS1-3), analyzed for metals. Advanced 3 soil borings (SB1-3) for Rework and collected 6 soil/rock samples for VOCs, metals and explosives. |
Parsons ES |
Rework |
2002 |
August |
Parsons |
RL17 |
|
November |
TCEQ |
RL17 |