Project Number

Unknown

Unknown

Small arms ammunition, metal ammunition parts, aerial flares, and molten metal were disposed of in two trenches on the site.

CSSA

NA

1992

October

Reviewed available records at CSSA during preliminary evaluation for groundwater contamination.

Parsons ES

Order 67

1995

February

Performed EM geophysical survey on February 3. Found two geophysical anomalies potentially associated with waste management activities.

Parsons ES

Order 67

Performed GPR survey in northern trench on February 16. Provided strong response in area where metal was exposed on surface.

Parsons ES

Order 67

February - March

Drilled six soil borings (SB1-6) and collected soil/rock samples between February and March. Chromium concentrates in limestone exceeded background levels in several samples. Phthalates were also detected in several samples. Results are summarized in Table B28-1.

Parsons ES
Chemron
JEDI

Order 67

March

Collected groundwater sample from SB3 on March 1. None of the analytes exceed RRS2 standards. Results are summarized in Table2.

Parsons ES
Chemron

Order 67

May

Performed additional EM geophysical survey to verify data.

Parsons ES

Order 67

June

Drilled two soil borings (SB1R-2R) on June 14 and 15. Collected soil/rock samples and analyzed for VOCs. None found.

Parsons ES
Chemron
JEDI

Order 67

Collected groundwater sample from SB1R on June 15 and analyzed for VOCs. None found.

Parsons ES
Chemron

Order 67

June-July

Performed soil gas survey between June 29 and July 19. Found PCE at concentrations less than 1 ug/L in samples.

Parsons ES

Order 67

1997

February

Set up grid and performed magnetometer sweep at site on February 24 and 25.

Parsons ES
UXB

RL33

March - July

Excavated trenches and sifted soil to remove scrap metal and UXO. Found small amounts of UXO in two trenches.

Parsons ES
UXB

RL33

June

Work Plan for B-28 Investigation submitted.

Parsons ES

RL17

June

Collected sample of sifted soil on June 19. Analytical results are in question due to ITS Laboratory practices.

Parsons ES
ITS

RL33

1999

January

Addendum to Work Plan for interim measures submitted.

Parsons ES

RL74

April

EPA memorandum indicated analytical results obtained from ITS are not usable.

EPA

NA

November

Submitted work plan for resampling to replace analytical chemistry data generated by ITS Laboratory.

Parsons ES

NA

2000

April

Collected 1 sift sample (Sift 6) for Rework, analyzed for metals and explosives.

Parsons ES
O’Brien & Gere
Data Chem

Rework

Collected 3 sift samples (Sift 3-5) for metals and explosives analysis (1 sample) and metals analysis only (2 samples).

Parsons ES
APPL, Inc.
Data Chem

RL83

2004

October

Treated existing soil stockpile with phosphate.

Parsons

TO19

January

Waste characterization samples collected from 800 to 1100 cy of phosphate treated soils.

Parsons

TO19

February

Disposed of 595 cu. yds. of phosphate treated soils.

Parsons

TO19

May

Collected 15 surface soil samples.

Parsons

TO19

2010

June

Performed XRF analysis at the site to determine the extent of metals in surface soils. 

Parsons

DO50

November

Collected 37 surface soil samples on-site, collected 3 additional soil samples north of site, put erosion control in place, and began excavation.

Parsons

NA

December

Continued excavation, XRF used to verify vertical excavation, confirmation samples collected from excavation sides and bottom.

Parsons

NA

2011

February

Additional excavation performed at select locations, confirmation soil samples collected.

Parsons

NA

August

Release Investigation Report submitted to TCEQ.

Parsons

NA

November

Closure approved by TCEQ.

TCEQ

NA