[Home]

[SWMU B-20/B-21]

SWMU B-20 Investigation Report Addendum, June 1996

Table of Contents

Section 1 - Introduction

1.1   Purpose of Report

1.1.1   Regulatory Basis

1.1.2   Project Authorization

1.2   Site Description

1.3   Chronology of Events

1.4   Objectives and Scope

1.4.1   Objectives

1.4.2   Scope

1.5   Report Organization

Section 2 - Summary of Previous Investigation Results

2.1   Preliminary Sampling Results

2.2   Remedial Investigation (Phase I) Results

2.2.1   Surface Soils

2.2.2   Subsurface Soils

2.2.3   Surface Water and Sediment

Section 3 - Results of Current Investigation

3.1   Surface Soil Sampling and Analytical Results

3.1.1   Explosives Analyses

3.1.2   Metals Analyses

3.2   Subsurface Soil Analytical Results

3.3   Unexploded Ordnance Screening

3.3.1   Surface Clearance of Site and Surrounding Area

3.3.2   Surface Clearance in Area North of Original B-20 Boundary

3.3.3   Subsurface Clearance in Northern Portion of Site

3.3.4   Subsurface Clearance of Craters

3.3.5   UXO Removal and Destruction

Section 4 - Conclusions

4.1   Surface Soils

4.1.1   Unexploded Ordnance

4.1.2   Chemical Contamination

4.2   Subsurface Soils

4.2.1   Unexploded Ordnance

4.2.2   Chemical Contamination

4.3   Surface Water

Section 5 - Closure Options and Recommendations

5.1 - Standard 1

5.1.1   Requirements

5.1.2   Recommendations

5.1.2.1   Surface Soil

5.1.2.2   Subsurface Soil

5.1.2.3   Surface Water and Sediment

5.2 - Standard 2

5.2.1   Requirements

5.2.2.   Recommendations

5.2.2.1   Surface Soil

5.2.2.2   Subsurface Soil

5.2.2.3   Surface Water

Section 6 - References

Appendices

Appendix A   Amendments to Project Plans, September 1995 and December 1995

Appendix B   Summary of Preliminary Sampling Results (January 1994)

Appendix C   Summary of Remedial Investigation (First Phase) Results (November 1994 through March 1994)

Appendix D   Data Validation Summary Report

Appendix E   Soil Boring Logs

Appendix F   Unexploded Ordnance Found at B-20

Appendix G   Preliminary Evaluation of Remedial Alternatives

Figures

Figure 1.2   Site Location Map

Figure 1.3   Site Map

Figure 3.1   Surface Soil Sample Locations

Figure 3.2   Surface Soils Concentrations Exceeding MSCs (RRS2)

Figure 3.3   Surface Soils Exceeding Standardized RRS1 Criteria

Figure 3.4   Soil Boring Locations and SPLP Results

Figure 3.5   1995 Aerial Photograph Showing UXO Locations

Figure 3.6   Area North of B-20 Swept for UXO

Figure 3.7   Grids in Northern Portion of Site

Figure 3.8   Magnetic Anomalies Detected and Removed from Crater 1

Figure 3.9   Magnetic Anomalies Detected and Removed from Crater 3

Figure 3.10   Magnetic Anomalies Detected and Removed from Crater 4

Figure 3.11   Magnetic Anomalies Detected and Removed from Crater 5

Figure 3.12   Magnetic Anomalies Detected and Removed from Crater 6

Figure 3.13   Magnetic Anomalies Detected and Removed from Crater 7

Figure 3.14   Magnetic Anomalies Detected and Removed from Crater 8

Figure 3.15   Magnetic Anomalies Detected and Removed from Crater 9