Solid Waste Management Unit B-19
Chronology of Actions/Investigations

Year

Month

Action/Results

Action Performed By

Project Number

Unknown

Unknown

Site used as “scrape” area to collect dirt and gravel.  Miscellaneous solid waste, metal, and weapons may have been disposed at the site.

CSSA

NA

1992

October

Reviewed available records at CSSA during preliminary evaluation for groundwater contamination.

Parsons ES

Order 67

1995

February

Performed GPR survey at the site.

Parsons ES

Order 67

1995

February

Performed EM geophysical survey on February 3.  Found no geophysical anomalies.

1995

February

Drilled three soil borings (SB1-3) between February 23 and 27, and collected soil/rock samples.  The chromium concentration in one sample slightly exceeded the background concentration.  Phthalates were detected in every sample.  Results are summarized in Table B19-1.

Parsons ES
Chemron
JEDI

Order 67

1995

February

Collected groundwater sample from SB3 on February 28 and analyzed for VOCs.  None found.  Results are summarized in Table B19-1.

Parsons ES
Chemron

Order 67

1995

June

Because VOC holding times for the February 1995 samples were missed, redrilled three soil borings (SB1R-3R) and collected soil/rock samples.  Found no VOCs in samples.  Results are summarized in Table B19-1.

Parsons ES
Chemron
JEDI

Order 67

1995

June

Collected three groundwater samples from SB1R-3R on June 14 and 15.  Found PCE in SB2R at a concentration exceeding the RRS2-GW standard.

Parsons ES
Chemron

Order 67

1996

February

Work Plan for B-19 investigation submitted.

Parsons ES

RL17

1996

August - September

Drilled three soil borings (SB4-6) between August 30 and September 4, and collected soil/rock samples.  Analytical results are currently in question due to ITS Laboratory practices.

Parsons ES
ITS
Core Terra

RL17

1999

April

EPA memorandum indicated analytical results obtained from ITS are not usable.

EPA

NA

1996

November

Submitted work plan for resampling to replace analytical chemistry data generated by ITS Laboratory.

Parsons ES

Rework

2000

March

Advanced 3 soil borings (SB1-3) for Rework and collected 9 samples for chromium and Di-n-butylphtalate analysis.

Parsons ES
APPL, Inc.
O’Brien & Gere

Rework

2002

June

Final RCRA Facility Investigation/Closure Report submitted

Parsons

RL17

2002

September

TCEQ issued approval for site closure.

TCEQ

NA