Unknown

Unknown

Site served as a landfill area for large pieces of scrap metal and weapons.

CSSA

NA

1995

May

Geophysical survey performed on May 5. No anomalies detected.

Parsons ES

RL17

1996

February

Work Plan for B-12 investigation submitted.

Parsons ES

RL17

August - September

Soil borings (SB1-SB4) drilled and samples collected on August 30 and September 3. Analytical results are currently in question due to ITS Laboratory practices.

Parsons ES

CoreTerra

ITS

RL17

1999

April

EPA memorandum indicated analytical results obtained from ITS are not usable.

EPA

NA

November

Submitted work plan for resampling to replace analytical chemistry data generated by ITS Laboratory.

Parsons ES

NA

2000

March

Advanced four soil borings (SB1-4) for Rework and collected 12 samples for VOCs, SVOCs, metals and explosive analysis.

Parsons ES

APPL, Inc.

O’Brien & Gere

Data Chem

Rework

2002

July

Final SWMU B-12 RCRA Facility Investigation Report submitted.

Parsons

RL17

2003

December

Final TO 0019 Work Plan Addendum submitted.

Parsons

TO19

2004

February - June

Began site excavation. Removed approximately 2,500 cu. yds.  Contents found were mostly metal debris, large concrete rocks, and construction debris. 

Collected waste characterization samples on all stockpiles. 

Excavated soil stockpile that came back hazardous was mixed with phosphate.  Confirmation samples collected two weeks after mixing with phosphate.

Site backfilled and berms knocked down to fill in low areas.

Parsons

TO19

2005 April

Final SWMU B-12 RCRA Facility Investigation Closure Report submitted.

Parsons TO19
July

Closure approved by TCEQ.