1.0 - Introduction
This document is a
revised addendum for modification two of the subject delivery order of the
Sampling
and Analysis Plan (SAP) dated May 31, 2001 for the quarterly on-post
groundwater sampling as specified in AETC Delivery Order 5084 as modified (Environmental
Encyclopedia Volume 1-4, Field Sampling and Analysis Plan tab and QAPP tab).
The purpose of this addendum is to address variances or changes to the
existing SAP.
2.0 - On-Post Groundwater Sampling Overview
The objective of
the on-post groundwater monitoring is to determine the concentration of
contaminants, if any, present in groundwater underlying the facility as part of
a quarterly facility-wide evaluation. A
subsidiary objective of the on-post quarterly sampling is to assess whether
there are apparent trends (decreasing or increasing) in contaminant levels over
time in the tested wells.
The current
objectives of the groundwater monitoring program, in general, are to determine
groundwater flow direction and water levels, determine groundwater contaminant
concentrations for characterization purposes, and identify seasonal variations
in physical and chemical properties. Overall
data quality objectives (DQOs) for the investigations at CSSA are provided in
Volume
1-1 behind the RFI Addendum tab (Section 11).
A list identifying the DQOs for CSSA’s groundwater monitoring program
includes:
Conducting groundwater sampling in accordance with procedures defined in
applicable work plans, the SAP, QAPP, and HSP; |
|
Preparing accurate and seasonal water-level contour maps; |
|
Identifying any temporal changes in hydraulic gradients due to season influences; |
|
Characterizing the horizontal and vertical extent of any immiscible or
dissolved plume(s) originating from the post; |
|
Meeting AFCEE QAPP quality assurance requirements;
|
|
Evaluating quarterly data for contaminant concentration trends. |
2.1 Procedures
for Sampling Activities
Three rounds of groundwater samples will be collected from twenty-four drinking
water and monitoring wells beginning in June 2001.
Twenty-eight wells will be sampled during the September and December 2001
sampling events. A summary of the
wells that are scheduled to be sampled during each event is provided in Table
1. No modification is needed for the groundwater sampling
methodology described in Section 2.1.5 of the
SAP.
2.2 Contaminants of Concern and Analytical Methods
Constituents of concern for groundwater monitoring will initially include VOCs
and metals. Cations and anions will
be analyzed only during the first round of sampling at newly constructed
monitoring wells to characterize aqueous geochemistry in various zones.
Analytical methodologies for the groundwater sampling planned under this
delivery order are summarized in Table 1. QA/QC
sampling and analysis will also be performed to meet the requirements of the
AFCEE QAPP and the SAP for the overall quarterly sampling event.
Table
1 -
Constituents of Concern and Methods of Analysis for On-post Groundwater Sampling
Analyte |
Methods/Analyses |
Volatile
Organics
Total
Metals
Cations
Anions |
SW8260B
SW6010/7000
SW6010B
SW9056 |
Note: Metals analysis will include
barium, chromium, copper, nickel and zinc by SW6010B, and arsenic (SW7060A),
mercury (SW7471A), cadmium (SW7131A), and lead (SW7421). |
3.0 - Data Management Process
A process for
collecting and entering data into electronic formats was developed specifically
for the data collection activities under this delivery order.
The key component of the data collection process is use of a Trimble
ProXR/XRS Receiver with the TSC1 Data Logger, and the associated Pathfinder
Office Software and the use of an electronic chain of custody.
The general details of this process are listed below.
A data dictionary will be created in Trimble Pathfinder Software that will include the site identification (siteid), location identification (locid), pH (pH), conductivity (cond), water temperature (temp), date, time, and remarks.
The groundwater sample will be collected as described in the SAP and this SAP addendum. Data collected in the field (siteid, locid, pH, cond, temp, and remarks) will be entered directly into the Trimble unit. Date, time, and coordinates are automatically generated by the Trimble unit.
The on-post groundwater samples will be labeled by a sample numbering system, used as a tracking mechanism to allow retrieval of information about a particular location and to assure that each sample is uniquely numbered. The procedure outlined in the FSP will be used.
Analytical testing requirements and sample information will be entered into an electronic chain of custody that will be shipped to the laboratory with the associated sample cooler.
At the conclusion of each day, data entered into the Trimble unit will be
downloaded into a computer at CSSA utilizing Trimble software.
It may be necessary to correct location data using differential
calculations and during the downloading process.
4.0 - Investigation-Derived Waste
Purge water generated from groundwater sampling activities will be managed as
described in the field sampling plan (Environmental
Encyclopedia, Volume 1-4, Sampling and Analysis Plan tab, Sections 1.7 and 2.1.6).
It is assumed that TNRCC approval of discharge from the GAC unit will be
obtained by the time the wells are sampled, and that all purge waters will be