[Home] [Master Table of Contents]

[Volume 1-2 Index]

SWMU B-23A Links

SWMU B-23A View Facing West - January 1999

Site Status: Closed (March 2005)

Background

bullet

Description in Current Conditions Report (July 1999)

bullet

Chronology

bullet

Aerial Photograph

Plans (Volume 1-2)

bullet

RL17 RFI Work Plan (February 1996)

bullet

RL83 RFI Work Plan RFI (August 1999)

bullet

Figure B23A-1 Proposed Sample Locations

bullet

TO0019 Work Plan (December 2003)

Investigation Reports (Volume 3-1)

bullet

List of Relevant Previous Investigation Reports

bullet

Section 8 of the Technical Memorandum on Geophysical Surveys (October 1995)

bullet

RCRA Facility Investigation Report (July 2003)

bullet

RCRA Facility Investigation/Closure Report (August 2004)

Figures
bullet

Figure B23A-1  Site Location Map

bullet

Figure B23A-2  Soils and Topographic Map

bullet

Figure B23A-3  Geologic Setting

bullet

Figure B23A-4  Sample Location Map

bullet

Figure B23A-5  Photograph of Ampoule Collected from Trench Surface

Tables
bullet

Table B23A-1   Summary of Chemical Constituents Detected in Surface Soils, January 2003