SWMU B-2 View Facing Northwest - January 1999

Site Status: Active Range

Background

bullet

Description in Current Conditions Report (July 1999)

bullet

Chronology

bullet

Aerial Photograph

Plans (Volume 1-2)
bullet

Future Project RFI Work Plan (August 1999)

bullet

TO0019 Work Plan Addendum (December 2003)

bullet

Final Work Plan Addendum for SWMUs B-2 and B-8 (May 2010)

Investigation Reports (Volume 3-1)
bullet

List of Previous Investigation Reports

bullet

Section 3 of Technical Memorandum on Surface Geophysical Surveys, Well 16 Source Characterization (June 1995)

bullet

Section 4 of Technical Memorandum on Soil Boring Investigation (June 1995)

bullet

Addendum to Technical Memorandum on Soil Boring Investigation (August 1995)

bullet

Section 2, Technical Memorandum on Soil Gas Surveys (June 1996)

bullet

RCRA Facility Investigation Report (June 2002)

Tables
bullet

Table B2-1  Chemical Constituents Detected in Soil (March 1995)

bullet

Table B2-2  Chemical Constituents Detected in Groundwater (March 1995)

Figures
bullet

Analytical Results Map (March 1995)

bullet

Geophysical Anomaly Map (June 1995)

bullet

Figure B2-1  Site Location Map (June 2002)

bullet

Figure B2-2  Soils and Topographic Map (June 2002)

bullet

Figure B2-3  Geologic Setting (June 2002)

bullet

Figure B2-4  Sample Location Map (June 2002)

Boring Logs
bullet

B2-SB1 (March 1995)

bullet

B2-SB2 (March 1995)

bullet

B2-SB3 (March 1995)

bullet

B2-SB4 (March 1995)

bullet

B2-SB5 (March 1995)