[Home] [Master Table of Contents]

[Volume 1-2 Table of Contents]

SWMU B-1 Links

Site Status: Closed (November 2002)

Background

bullet

Description in Current Conditions Report (July 1999)

bullet

Chronology

bullet

Aerial Photograph

bullet

Figure B1-1 Plan View Map

Plans (Volume 1-2)

bullet

RL17 RFI Work Plan (February 1996)

bullet

RL17 Work Plan Amendment for Data Quality Rework (May 2000)

Investigation/Closure Reports (Volume 3-1)

bullet

List of Previous Investigation Reports

bullet

Section Two of Technical Memorandum on Surface Geophysical Surveys, Well 16 Source Characterization (June 1995)

bullet

Section Three of Technical Memorandum on Soil Boring Investigation (June 1995)

bullet

Addendum to Technical Memorandum on Soil Boring Investigation (August 1995)

bullet

RCRA Facility Investigation/Closure Report (July 2002)

Tables

bullet

Table B1-1   Chemical Constituents Detected in Soil (February 1995)

bullet

Table B1-2   Chemical Constituents Detected in Groundwater (February 1995)  

bullet

Table B1-3   Summary of Chemical Constituents Detected in Soil (March 2000)

Figures

bullet

Analytical Results Map (February 1995)

bullet

Figure B1-1   Sample Location Map

bullet

Figure B1-2   Soils and Topographic Map

bullet

Figure B1-3   Geologic Setting

bullet

Figure B1-4   Sample Location Map

Boring Logs

bullet

Soil Boring Log 1 (February 1995)

bullet

Soil Boring Log 2 (February 1995)

bullet

Soil Boring Log 3 (February 1995)