[Home]
[Volume 1-6 Table of Contents]
Spill Prevention, Control, and Countermeasures Plan
Table of Contents
Project Engineer Certification
1.3 General Installation Information
Section 2 - General Requirements
2.1.1 Conformance 40 CFR §112.7(a)(1)
2.2 Spill Prediction [40 CFR §112.7(b)]
2.2.1 Potential Release Scenarios 2.2.2 Spill Flow Direction
2.3 Secondary Containment [40 CFR §112.7(c)]
2.4 Contingency Plan [40 CFR §112.7(d)]
2.4.1 Spill Response Equipment
2.4.3 Spill Contingency and Response Actions
2.4.3.1 Potential Spill Scenarios
2.4.3.2 Response Actions - Personnel Duties and Qualifications
2.5 Inspections Tests and Records [40 CFR §112.7(e)]
2.5.1.1 Aboveground Storage Tanks
2.6 Personnel, Training, and Discharge Prevention Procedures 40 CFR§112.7(f)
2.6.1 Training Program [40 CFR §112.7(f)(1)]
2.7.1 Fencing and Access [40 CFR §112.7(g)(1)]
2.7.2 Locking of Tanks [40 CFR §112.7(g)(2)]
2.7.3 Starter Control on Pumps [40 CFR §112.7(g)(3)]
2.8 Facility Tank Car and Tank TRUCK LOADING/UNLOADING RACK [40CFR§112(h)]
2.8.1 Facility transfer operations, pumping and facility process
2.8.2 Containment System [40 CFR §112.7(h)(1)]
2.8.3 Warning System [40 CFR §112.7(h)(2)]
2.8.4 Inspection of Drains and Outlets [40 CFR §112.7(h)(3)]
Section 3 - SPCC Requirements for OnShore Facilities [40 CFR §112.8]
3.1 General Requirements [40 CFR §112.8(a)]
3.2 Facility Drainage [40 CFR §112.8(b)]
3.3 Bulk Storage Containers [40 CFR §112.8(c)]
3.5 Facility Transfer Operations [40 CFR §112.8(d)]
Section 4 - Hazardous Substance Management Areas
4.1 Hazardous Substance Receipt, Transfer, and Storage Activities
4.2 Waste Generation And Accumulation
4.3 Onsite Waste Transfer and Storage
4.5 Miscellaneous Operations Areas
Section 5 - Implementation, Review, and Updating
5.1 Review and Update of Spill Plans
5.2 Regional Administrator Review
Section 6 - ISCP Introduction and Regulatory Background
Section 7 - Emergency Notification and Personnel Responsibilities
7.1 Organizations And Personnel Resources And Responsibilities
7.1.1 Installation On-Scene Coordinator
7.2 Off-post Spill Response Resources
7.2.2 State of Texas Spill Response Center
7.2.3 Regional Response Center
7.5 Personal Protective Equipment
Section 8 - Emergency Response Actions
8.1 Emergency Response Procedures
8.1.1 Immediate Actions - Discharge Detection by CSSA Personnel8.1.2 Emergency Containment Procedures
8.1.3 Spill Containment and Cleanup Procedures
8.1.4 Specific Potential Emergencies
8.1.4.3 Tank Spills and Leaks
Appendices
Appendix A Hazardous Substances Reportable Quantities
Appendix B Spill Logs
Appendix D Personnel Training Plan Outline
Appendix E Public Affairs Guidance
Figures
Figure 1.1 Plan View of Facility
Figure 2.2 Flow Diagram for Response to Emergency Situations
Figure 2.3 Flow Diagram for Response to Oil Spills
Figure 8.1 Emergency Notification Procedure
Tables
List of Local Emergency Response Organizations
Table 2-1 CSSA 40 CFR Part 112, Final Rule SPCC Plan Cross Reference
Table 2-2 Aboveground Storage Tanks
Table 2.3 Summary of Potential Spill Scenarios and Flow Direction
Table 2.4 Summary of Personnel Duties, Qualifications and Training
Table 2.5 CSSA Aboveground Storage Tank Filling Procedures
Table 7.1 List of Local Emergency Response Organizations
Table 7.2 Spill Control Materials and Equipment Available for Spill Response
Table 7.3 Personal Protective Equipment for Initial Site Entry