[Home]
[Groundwater Table of Contents]
1.4 Facility Background and Description
1.5 Groundwater Investigation Background
Section 2 - Well Installation Methodology
2.1 Drilling of Pilot Holes and Well Boreholes
2.2 Monitoring Well Construction
2.4 Monitoring Well Development
2.6 Geophysical Borehole Logging
2.9 Decontamination Procedures
2.10 Management of Investigation-Derived Waste
Section 3 - Conclusions and Recommendations
Appendices
Appendix A � Well Construction Logs:
Appendix B � Geophysical Logs
Appendix C � Packer Test Results
Appendix D � Well Survey Report
Appendix E � Data Verification Reports
Appendix F � Cumulative Analytical Data
Figures
Tables
Table 1 - Well Completion Data
Table 2 - Well Installation Report Lower Glen Rose and Glen Rose Analytical Detections