>
[Home]
September 2002 Off-Post
Appendix A - Evaluation of Data Quality Objectives Attainment
Activity | Objectives | Action | Objective Attained? | Recommendations |
Field Sampling | Conduct field sampling in accordance with procedures defined in the project work plan, SAP, QAPP, and HSP. | All sampling was conducted in accordance with the procedures described in the project plans. | Yes | NA |
Contamination Characterization (Groundwater Contamination) | Determine the potential extent of off-post contamination. | Samples for laboratory analysis were collected from selected off-post public and private wells, which are located within a � mile radius of CSSA. | Partially | Replace wells where no VOCs detected with wells located to the west and southwest of AOC-65 to provide better definition of plume 2. Continue sampling of wells to the west of plume 1 (Fair Oaks and Jackson Woods) to confirm any detections possibly related to plume 1. |
Meet AFCEE QAPP quality assurance requirements. | Samples were analyzed in accordance with the AFCEE QAPP, Version 3.0, and approved variances. All data were verified by a chemist. | Yes | NA | |
| | All data flagged with a �U,� �J,� and �F� are usable for characterizing contamination. | Yes | NA |