VOLUME 4: OTHER TECHNOLOGIES AND REPORTS
 

 

Electrokinetics

O-1 Treatability Study (April 1999)

Phytoremediation

Work Plan for B-20 Phytoremediation Treatability Study (September 1997)

Final Phytoremediation Treatability Study Report (May 2001)

Soil Washing

Final Soil Washing Treatability Study Report for SWMU B-20 (May 2000)

Stabilization and Off-Site Disposal

Final B-2 Soil Stabilization/Solidification Treatability Study Report (May 2000)

PIMS Field Demonstration Workplan (June 2001)

RFI and Interim Measures Waste Management Plan (August 2002)

Soil Pile Disposition Assessment

Soil Pile Disposition Assessment (August 2003)

AOC-65 Treatability Test Plan (April 2002)

Final PIMS Treatability Study (February 2004)

Final Addendum Work Plan for AOC-65 Interim Removal (January 2012)

Residential Vapor Intrusion Survey for AOC-65 (January 2013)