Sampling and Analysis Plan - Addendum Specific to Field Sampling Plan for Delivery Order TO42
Table of Contents
Section 2 - Installation of Monitoring Wells
2.1 Overview of Well Installations
2.2 Monitoring Well Specifications
2.4 Core Sample Collection
2.6 Totco Vertical Drift Indicator
2.7 Borehole Geophysical Surveys
2.7.1 Electric Logs (Resistivity and Spontaneous Potential)
2.7.2 Natural Gamma Ray Logs
2.7.3 Caliper Logs
2.8 Injection Packer Test Procedures
2.9 Discrete Interval Groundwater Samples
2.10 Well Upgrades
2.11 Transducer and Pump Installations
2.12 Monitoring Well Development
Section 3 - Groundwater Well sampling
3.2 Groundwater Sampling Methods
3.2.1 On-Site Wells with Dedicated Low-Flow Bladder Pumps
3.2.2 Shallow Wells Sampled by the Bailer Method
3.2.3 Westbay� Multi-Port Samplers
3.2.4 Deep Wells Sampled by the Bailer Method
3.2.5 On-Site Water Production Wells
3.2.6 Off-Site Domestic and Public Supply Wells
3.3 Groundwater Sample Identification
3.4 Groundwater Sampling Parameters
Section 4 - Decontamination Procedures
Section 5 - Investigation-Derived Waste Handling
5.2 Temporary Storage Containers
5.3 Granular Activated Carbon at Outfall 002
Appendices
Appendix A Sieve Analysis for 8/16-Mesh Sand
Appendix B Chemical Fingerprint Analysis For Quickfoam�
Appendix C Worksheets for Conducting Injection Packer Tests
Appendix D Well Development Record
Appendix E GAC Unit Operational Data
Appendix F Quarterly Groundwater Sampling Schedules March 2002 Through September 2003
Tables
Table 2.1 Estimated Quantities of Drilling Requirements
Table 2.2 Estimated Quantities of Environmental Samples
Table 2.3 Sampling Parameters from Soil/Rock Definitive Data Samples*
Table 2.4 Sampling Parameters from Water and Soil Screening Data Samples
Table 2.5 Sampling Parameters from Outfall 002 Screening Data Samples
Table 2.6 Example Sampling Identification for Project Samples
Table 2.7 Completion Information for Existing Wells
Table 2.8 Tasks for Well Upgrades
Table 9 Sample Quantities and Analytical Parameters
Table 10 Low-Flow Pump Installation Data and Minimum Tubing Purge Volumes
Table 11 Valid Groundwater Sample Identifications
Table 12 Sampling Parameters from Groundwater Definitive Data Samples
Figures
Figure 2.3 - Packer Test Design