Chronology of Actions/Investigations

Area of Concern 68

Year

Month

Action/Results

Action
Performed By

Project
Number

Prior to 1960

Unknown

Area includes metal slag/debris storage area from Wheelabrator operations adjacent to Building 90-2.

CSSA

NA

2001

January - February

Two soil gas survey samples were collected and analyzed for chlorinated and aromatic volatile organics.  No target VOC compounds were detected.

Parsons

DO 5084

2007

December

Excavated soil/Wheelabrator waste around Building 90-2. Approximately 50-60 CY of material were excavated from both AOC-67 and AOC-68.

Additional waste characterization and confirmation samples collected.

Parsons

DO11

2008

 

April

Investigation and confirmation samples collected at four locations.

Parsons

DO11

November

Excavation/removal and confirmation/site delineation sampling conducted at two locations. Approximately 15 CY of material removed and hauled off-post.

Parsons

DO11

2010

 

May

Release Investigation Report submitted to TCEQ.

Parsons

DO11

September

Closure of AOC-67 and AOC-68 approved by TCEQ.

TCEQ

NA