Project Number

Unknown

Unknown

AOC 53 consists of building foundation slab, southeast of SWMU B-27 at the intersection of Central Road and the road leading to the “D” tank.  Batteries were located at the rear end of the slab.

CSSA

NA

2004

October

Concrete slab (55’ x 45’ with four 3’ deep concrete footings) demolition. Building used for inert storage.

Parsons

TO19

2005

February

Collected sidewall and bottom confirmation samples from excavated area.

Excavated approx. 10-12 cu. yds. of soil from north and south ends of the site.  Collected 7 confirmation samples.

Parsons

TO19

March

Excavated soils and concrete debris hauled off-post and excavation backfilled.

Parsons

TO19

April

Final AOC 53 RCRA Facility Investigation Closure Report submitted.

Parsons

TO19

July

Closure approved by TCEQ.

TCEQ

NA