Area of Concern 38

Chronology of Actions/Investigations

Year

Month

Action/Results

Action Performed By

Project
Number

1995

May

Geophysical survey was conducted at all the "open" areas within a 2,000-foot radius of well 16, including AOC 38. Found one unexplained anomaly at this site and a 1.5-inch diameter metal pipe discovered.

Parsons

Order 67

June - July

Twenty-six soil-gas survey samples collected and analyzed for chlorinated and aromatic volatile organics. PCE and TCE were detected.

Parsons

Order 67

November- December

Additional 94 soil-gas survey samples were collected.

Parsons

Order 67

2000

January

Collected 60 surface soil samples (SS1-60) and analyzed samples for PCE, TCE and DCE.

Parsons ES

O'Brien & Gere

DO 5068

2003

December

Final TO 0019 Work Plan Addendum submitted.

Parsons

TO19

2004

April

Excavated rubble pile filled with barb wire, fencing, and concrete debris.  Pot shot excavations around the site showed nothing under the surface.

Parsons

TO19

September

Final RCRA Facility Investigation/Closure Report submitted to TCEQ.

Parsons

TO19

2005

February

Closure approved by TCEQ.

TCEQ

NA