Project Number

Unknown

Unknown

Area where a trench was observed in a 1966 aerial photograph. No other documentation regarding this area was found.

CSSA

NA

1996

February

Work Plan for B-26 investigation submitted.

Parsons ES

RL17

March

EM geophysical survey performed on March 5. One geophysical anomaly potentially associated with waste management activities was found.

Parsons ES
ITS

RL17

Collected 3 surface soil samples (SS1-3) on March 7,and analyzed them for VOCs, SVOCs, and metals. Analytical results are currently in question due to ITS Laboratory practices.

Parsons ES
ITS

RL17

September

Completed 3 soil borings (SB1-SB3) on September 4 and sampled for VOCs, SVOCs and metals. Analytical results were rejected due to ITS Laboratory practices.

Parsons ES
CoreTerra
ITS

RL17

1999

April

EPA memorandum indicated analytical results obtained from ITS are not usable.

EPA

NA

November

Submitted work plan for resampling to replace analytical chemistry data generated by ITS Laboratory.

Parsons ES

NA

2000

March

Collected 3 surface soil samples (SS1-3) for Rework, analyzed for VOCS, SVOCs, and metals.

Advanced 3 soil borings (SB1-3) for Rework and collected 8 soil/rock samples for VOCs, SVOCs and metal analysis.

Parsons ES
APPL, Inc.
O’Brien & Gere

Rework

2002

August

Final RCRA Facility Investigation Report submitted.

Parsons

RL17

2003

December

Final TO 0019 Work Plan Addendum submitted.

Parsons

TO19

Geophysical anomaly identified during the March 1996 geophysical survey was excavated. A single small piece of tin was recovered. No evidence of waste management or waste residue was encountered

Parsons

TO19

2004

July

Because the single piece of tin found at the site did not indicate waste management activities, a Delisting Report was submitted.

Parsons

TO19

2005

July

Delisting approved by TCEQ.

TCEQ

NA