[Home]  [Master Table of Contents]

[Work Plan Index]

Work Plan

Table 2.1 - Relative Requirements of TNRCC Risk Reduction Standards

Risk Reduction Standard

TNRCC Notification

TNRCC Approval Prior to Implementation

Risk Assessment and CMS Report

Post Closure Report

Final TNRCC Approval

Deed Certification

Post Closure Care

Closure to Background

X

-

-

X

X

-

-

Closure to Health-Based Standard

X

-

-

X

X

X

X

Closure with Controls

X

X

X

X

X

X

X

X = Required action for closure under the listed standard.

CMS = Corrective measures study