WORK PLAN, FEBRUARY 1996

Table of Contents

 

Section 1 -- RL17 Introduction and Background

Section 2 -- RL17 SWMU Closure Tasks

Section 3 -- RL17 Reporting Requirements

Section 4 -- RL17 Project Schedule

Section 5 -- RL33 Work Plan Addendum

Section 6 -- RL53 Work Plan Addendum

Section 7 -- RL74 Interim Measures Work Plan

Section 8 -- DO23 Work Plan Addendum for the Groundwater Evaluation, Monitoring, and Well Installation Project

Section 9 -- RL83 Work Plan Addendum (January 2000)

Section 10 -- RL17 Rework Work Plan Addendum

Section 11 -- RFI Work Plan

Section 12 -- DO 5068 Work Plan Addendum

Section 12 -- DO 5068 Work Plan Addendum Version 2 (February 2001)

Section 13 -- DO 5084 Work Plan Addendum (Revision 1)

Section 14 -- DO 5084 Work Plan Addendum (Revision 2, February 2002)

Section 15 -- TO 0042 Work Plan Addendum (Revision 1)

Section 16 -- TO 0008 Work Plan Addendum (December 2003)

Section 17 -- TO 0019 Final Environmental Cleanup Plan for AOCs and SWMUs

Section 18 -- TO 0009 Environmental Cleanup Plan

Section 19 -- TO 0009 Data Quality Objectives

Section 20 -- TO 0009 Standard Operating Procedures

DO50 Addendum (April 2010)

Final DO50 Well Installation Work Plan Addendum (April 2010)

Final ISCO Tracer Test Work Plan (May 2012)

 

Appendices

Appendix A -- SWMU Location Maps 1 and 2

Appendix B -- Soil Sifting Technical Approach

Appendix C -- Waste Disposal Technical Approach, Waste Analysis Plan

Appendix D -- Standard Operating Procedures for Soil Stabilization

Appendix E -- Amendment to Health and Safety Plan for RL33

 

Updated December 2019