WORK PLAN, FEBRUARY 1996
Table of Contents
Section 1 -- RL17 Introduction and Background
Section 2 -- RL17 SWMU Closure Tasks
Section 3 -- RL17 Reporting Requirements
Section 4 -- RL17 Project Schedule
Section 5 -- RL33 Work Plan Addendum
Section 6 -- RL53 Work Plan Addendum
Section 7 -- RL74 Interim Measures Work Plan
Section 9 -- RL83 Work Plan Addendum (January 2000)
Section 10 -- RL17 Rework Work Plan Addendum
Section 12 -- DO 5068 Work Plan Addendum
Section 12 -- DO 5068 Work Plan Addendum Version 2 (February 2001)
Section 13 -- DO 5084 Work Plan Addendum (Revision 1)
Section 14 -- DO 5084 Work Plan Addendum (Revision 2, February 2002)
Section 15 -- TO 0042 Work Plan Addendum (Revision 1)
Section 16 -- TO 0008 Work Plan Addendum (December 2003)
Section 17 -- TO 0019 Final Environmental Cleanup Plan for AOCs and SWMUs
Section 18 -- TO 0009 Environmental Cleanup Plan
Section 19 -- TO 0009 Data Quality Objectives
Section 20 -- TO 0009 Standard Operating Procedures
Final DO50 Well Installation Work Plan Addendum (April 2010)
Final ISCO Tracer Test Work Plan (May 2012)
Appendices
Appendix A -- SWMU Location Maps 1 and 2
Appendix B -- Soil Sifting Technical Approach
Appendix C -- Waste Disposal Technical Approach, Waste Analysis Plan
Appendix D -- Standard Operating Procedures for Soil Stabilization
Appendix E -- Amendment to Health and Safety Plan for RL33
Updated December 2019