18th Final Quarterly Progress Report, August 1 – October 31, 2003 (November 2003)

Table of Contents

This 18th quarterly progress report for Camp Stanley Storage Activity (CSSA), Texas, U.S. Environmental Protection Agency (EPA) Identification Number TX2210020739, is submitted in accordance with the Administrative Order on Consent (Order) issued to CSSA on May 5, 1999, pursuant to §3008(h) of the Safe Drinking Water Act (SDWA), as amended by Resource Conservation and Recovery Act (RCRA), and further amended by the Hazardous and Solid Waste Act (HSWA) of 1984, 42 U.S.C. §6928(h). This report addresses the project progress from August 1, 2003, through October 31, 2003 (Quarter 18). Subsequent progress reports will continue to be submitted on a quarterly basis.

This report details work completed on tasks associated with the four project phases outlined in the Order. Phase names and task names listed below are taken directly from the Order. Information requested in the Order for each active task is provided in this report. If the task is not yet active, that is also noted.

Interim Measures

Task I

Interim/Stabilization Measures (I/SM) Work Plan (WP)

Task II

I/SM Implementation

Task III

Reports

RCRA Facility Investigation

Task I

Preliminary Report: Description of Current Conditions (DCC)

Task II

RCRA Facility Investigation (RFI) WP

Task III

Facility Investigation

Task IV

Human Health and Ecological Risk Assessment

Task V

Investigation Analysis

Task VI

Treatability Studies

Task VII

Progress Reports

Corrective Measures Study

Task VIII

Identification and Development of Corrective Action Alternatives

Task IX

Evaluation of Corrective Measures Alternatives

Task X

Reports

Corrective Measures Implementation

Task XI

Corrective Measure Implementation (CMI) Program Plan

Task XII

Corrective Measure Design

Task XIII

Corrective Measure Construction

Task XIV

Reports

Details of the evaluation of the percent complete by task are included as Table 1. An updated project team chart along with telephone numbers and addresses are included as Table 2. The Project Financial Information Summary and the Percentage of Funds Expended, which is required every third progress report, is included as Attachment 1 in this quarterly report for Quarter 18. Attachment 2 includes the figures referenced in this report. A summary of the status of all identified Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) present at CSSA is provided in Attachment 3.